Appendix 3Example of a road signing checklist#

Site signing record#

Date: Road: Suburb: Time installed: am/pm Time removed: am/pm Chainage: Lane closed: Left / Centre / Right Direction: In bound / Out bound Lane closure changes required: Yes / No Lane changed to: Left / Centre / Right Time: am/pm Visibility: Good / Poor Weather conditions: Fine / Dry / Wet / Cloudy / Fog / Night / Ice / Smoke

Signs and devices not listed below may be added to page 2

Position noSign descriptionNumber installedDistance from previous signTime checked 1 2 3 4
ROADWORK 1 km AHEAD
ROADWORK AHEAD NIGHT - Supplementary plate for night work
80 kph - Speed reduction sign
ROAD PLANT AHEAD
WORKERS AHEAD
60 kph - Speed reduction sign (1.2 m to 3.0 m)
REDUCE SPEED
40 kph - Speed reduction sign (less than 1.2 m)
TWO LANE STATUS
THREE LANE STATUS
FOUR LANE STATUS
LATERAL SHIFT MARKERS
TRAFFIC CONTROLLER AHEAD
STOP/SLOW BAT
PREPARE TO STOP
TRAFFIC SIGNALS AHEAD
STOP HERE ON RED SIGNAL
PORTABLE TRAFFIC SIGNALS
TRAFFIC CONES - 700 mm
TRAFFIC CONES - 450 mm
TRAFFIC CONES - 300 mm (linemarking only)
END ROADWORK
SPEED SIGN - restored to appropriate limit
TRACTOR/SLASHER AHEAD - (symbolic)
PROBABLE DELAY 15 MINUTES
SIGNALS UNDER REPAIR
POLICE CONTROL AHEAD
VARIABLE MESSAGE SIGN
ARROW BOARD
BARRIER BOARD

Signature: _________________________________ Date: _____/_____/________ (Person in control of the worksite)

Source: Traffic Mgmt Construction/Maintenance CoP 2008 · page 27 Open PDF at this page Search this document