Relationship table (harmonised to AGTTM04-21 Edition 1.1)#

SectionDescriptionApplicability
1Introduction
1.1PurposeAccepted
1.2Structure of AGTTMAccepted
1.3Scope of Part 4Accepted
1.4Application of Part 4 to New ZealandAccepted
1.5DefinitionsAccepted
2Design Process
2.1GeneralAccepted
2.2Risk AssessmentAccepted, with amendments
2.2.1Risk considerationsAccepted
2.3Design StepsAccepted
2.4Design BalanceAccepted
2.5Essential Design PrinciplesAccepted
2.5.1Worksite layoutAccepted
2.5.2Sight distanceAccepted
2.5.3SignsAccepted, with amendments
2.5.4Road categoriesAccepted
2.5.5Traffic volumeAccepted
2.5.6SpeedAccepted
2.5.7Variations to designAccepted, with amendments
2.5.8Combining different works protection methodsNew
3TGS Design for Mobile Works
3.1GeneralAccepted
3.2ActivitiesAccepted
3.2.1Class 1Accepted
3.2.2Class 2Accepted
3.2.3Class 3Accepted
SectionDescriptionApplicability
3.3Step 1 – Confirm the Works can be Defined as Mobile WorksAccepted
3.4Step 2 – Identify the Works LocationAccepted
3.5Step 3 – Determine the Needs of the Works ConvoyAccepted
3.5.1Lead vehicleAccepted
3.5.2Work vehicleAccepted
3.5.3Shadow vehicleAccepted with amendments
3.5.4Advance warning vehicleAccepted
3.5.5Vehicle positioningAccepted
3.6Step 4 – Determine the Works Convoy SpacingAccepted
3.7Step 5 – Determine the Signs and Devices to useAccepted
3.7.1Advance warningAccepted with amendments
3.7.2Signs mounted on vehiclesAccepted with amendments
3.7.3Works within a shoulderAccepted
3.7.4Works within a laneAccepted
3.7.5Works involving a side street, signalised intersection, freeway on-ramp or off-rampAccepted
3.8Step 6 – Identify the Operational Procedures to be FollowedAccepted
3.8.1Reduced sight distanceAccepted
3.8.2SignsAccepted
3.8.3Advance warningAccepted
3.8.4Mobile temporary speed zoneAccepted with amendments
3.8.5Workers on footAccepted
3.8.6Work convoy arrangementsAccepted
3.8.7Maintaining traffic flowAccepted
3.8.8CommunicationAccepted
3.8.9Pedestrians and cyclistsAccepted
3.8.10Road marking & line markingAccepted
SectionDescriptionApplicability
3.8.11Kerbside collection and street sweepingAccepted
3.8.12Rolling blocksAccepted
3.8.13Unsealed roadsAccepted
3.9Step 7 – Design the Traffic Guidance Scheme and Document the Notes for Field StaffAccepted