Relationship table (harmonised to AGTTM06-21 Edition 1.1)#

SectionDescriptionApplicability
1Introduction
1.1PurposeAccepted
1.2Structure of AGTTMAccepted
1.3Scope of Part 6Accepted
1.4Field Work for Office-based StaffAccepted
1.5Application of Part 6 to New ZealandAccepted
1.6AcronymsAccepted
1.7DefinitionsAccepted
2TTM Principles and Road Categories
2.1TTM PrinciplesAccepted
2.1.1FundamentalsAccepted
2.1.2Basic principlesAccepted
2.2Traffic Management ImplementerAccepted
2.3Road CategorisationAccepted
3Roles and Responsibilities
3.1TTM RolesAccepted
3.1.1Other TTM workersAccepted
3.2Example – Career Path ProgressionAccepted
3.3TTM RelationshipsAccepted
3.3.1Principal Contractor – TTM responsibilitiesAccepted
3.3.2TMDAccepted
3.3.3TMI responsibilities for TTM on a worksite include:Accepted with amendments
3.3.4Interactions between the Principal Contractor and the TMIAccepted
3.3.5TMI – TC / Other TTM worker interactionsAccepted
3.3.6Traffic Controller (TC)Accepted
3.3.7Other TTM workersAccepted
4Pre-Shift Activities
4.1GeneralAccepted
4.2Vehicle ChecksAccepted
4.3Job Pack CheckAccepted
4.4Equipment and DevicesAccepted
4.5Condition of DevicesAccepted
4.5.1CleanlinessAccepted
4.5.2Colour of fluorescent signsAccepted
4.5.3Low light visibilityAccepted
4.6ResourcesAccepted
5Pre-start
5.1GeneralAccepted
5.1.1Identify hazardsAccepted
5.1.2Assess the riskAccepted
5.1.3Implement controlsAccepted
5.1.4Monitor and reviewAccepted
5.2TMP and TGS Development – Residual Risk RegisterAccepted
5.3On Site Safety Analysis and Risk AssessmentAccepted
5.4Toolbox TalksAccepted
5.4.1TTM staffAccepted
5.4.2Construction workers / visitorsAccepted
6TGS Installation
6.1GeneralAccepted
6.2Typical Installation PrinciplesAccepted
6.3Installation ProcessAccepted
6.4Placement of Signs and DevicesAccepted
6.4.1Two-way road – lane closureAccepted
6.4.2Two-way road (lateral shift)Accepted
6.4.3Two-way road – lane closure with side roadsAccepted
6.4.4Multi-lane un-divided road – lane closureAccepted
6.4.5Multi-lane divided road – left or right lane closureAccepted
6.5Positioning of Signs and DevicesAccepted with amendments
6.6Typical Locations for SignsAccepted
6.6.1Long termAccepted with amendments
6.6.2Short termAccepted
6.7Orientation of Signs and DevicesAccepted
6.8TolerancesAccepted with amendments
6.9ITS DevicesAccepted
7TGS Operation and Maintenance
7.1GeneralAccepted
7.2Before Work StartsAccepted
7.3During the Hours of WorkAccepted
7.4Aftercare – Worksite Arrangements Outside Working HoursAccepted with amendments
7.5Record KeepingAccepted
7.6IncidentsAccepted
7.7TMI MonitoringAccepted
7.8Monitor and Measure TTMAccepted
7.9Excessive or Inappropriate Use of Temporary Speed LimitsAccepted
7.10Excessive SignageAccepted
7.11Near missesNew
8TGS Removal
8.1GeneralAccepted
8.2Typical Removal PrinciplesAccepted
8.3Removal ProcessAccepted
8.4Removal Order for Signs and DevicesAccepted
8.4.1Two-way road – lane closureAccepted
8.4.2Two-way road – lateral shiftAccepted
8.4.3Two-way road – lane closure with side road intersectionsAccepted
8.4.4Multi-lane un-divided road – lane closureAccepted
8.4.5Multi-lane divided road – left or right lane closureAccepted
9Low Light Works
9.1Activity During Low LightAccepted
9.2Artificial LightingAccepted
10Unattended Sites
Accepted
Appendices
ASample TTM Career Path StagesAccepted
BSample Risk Assessment FormAccepted
CSample Toolbox TalkAccepted
1On Site Traffic Guidance SchemesAccepted
2Assessment of Site Factors:Accepted
3Assessment of Work Procedure Factors:Accepted
4Also Consider:Accepted
5Emergency PreparednessAccepted
6On Site Traffic Control TipsAccepted
Complete and attach Toolbox Meeting Form and process as per company policy.Accepted
DSample Daily Traffic Management DiaryAccepted
Table in words
  • Section 1 is Introduction.
  • Section 1.1 is Purpose and its applicability is Accepted.
  • Section 1.2 is Structure of AGTTM and its applicability is Accepted.
  • Section 1.3 is Scope of Part 6 and its applicability is Accepted.
  • Section 1.4 is Field Work for Office-based Staff and its applicability is Accepted.
  • Section 1.5 is Application of Part 6 to New Zealand and its applicability is Accepted.
  • Section 1.6 is Acronyms and its applicability is Accepted.
  • Section 1.7 is Definitions and its applicability is Accepted.
  • Section 2 is TTM Principles and Road Categories.
  • Section 2.1 is TTM Principles and its applicability is Accepted.
  • Section 2.1.1 is Fundamentals and its applicability is Accepted.
  • Section 2.1.2 is Basic principles and its applicability is Accepted.
  • Section 2.2 is Traffic Management Implementer and its applicability is Accepted.
  • Section 2.3 is Road Categorisation and its applicability is Accepted.
  • Section 3 is Roles and Responsibilities.
  • Section 3.1 is TTM Roles and its applicability is Accepted.
  • Section 3.1.1 is Other TTM workers and its applicability is Accepted.
  • Section 3.2 is Example – Career Path Progression and its applicability is Accepted.
  • Section 3.3 is TTM Relationships and its applicability is Accepted.
  • Section 3.3.1 is Principal Contractor – TTM responsibilities and its applicability is Accepted.
  • Section 3.3.2 is TMD and its applicability is Accepted.
  • Section 3.3.3 is TMI responsibilities for TTM on a worksite include: and its applicability is Accepted with amendments.
  • Section 3.3.4 is Interactions between the Principal Contractor and the TMI and its applicability is Accepted.
  • Section 3.3.5 is TMI – TC / Other TTM worker interactions and its applicability is Accepted.
  • Section 3.3.6 is Traffic Controller (TC) and its applicability is Accepted.
  • Section 3.3.7 is Other TTM workers and its applicability is Accepted.
  • Section 4 is Pre-Shift Activities.
  • Section 4.1 is General and its applicability is Accepted.
  • Section 4.2 is Vehicle Checks and its applicability is Accepted.
  • Section 4.3 is Job Pack Check and its applicability is Accepted.
  • Section 4.4 is Equipment and Devices and its applicability is Accepted.
  • Section 4.5 is Condition of Devices and its applicability is Accepted.
  • Section 4.5.1 is Cleanliness and its applicability is Accepted.
  • Section 4.5.2 is Colour of fluorescent signs and its applicability is Accepted.
  • Section 4.5.3 is Low light visibility and its applicability is Accepted.
  • Section 4.6 is Resources and its applicability is Accepted.
  • Section 5 is Pre-start.
  • Section 5.1 is General and its applicability is Accepted.
  • Section 5.1.1 is Identify hazards and its applicability is Accepted.
  • Section 5.1.2 is Assess the risk and its applicability is Accepted.
  • Section 5.1.3 is Implement controls and its applicability is Accepted.
  • Section 5.1.4 is Monitor and review and its applicability is Accepted.
  • Section 5.2 is TMP and TGS Development – Residual Risk Register and its applicability is Accepted.
  • Section 5.3 is On Site Safety Analysis and Risk Assessment and its applicability is Accepted.
  • Section 5.4 is Toolbox Talks and its applicability is Accepted.
  • Section 5.4.1 is TTM staff and its applicability is Accepted.
  • Section 5.4.2 is Construction workers / visitors and its applicability is Accepted.
  • Section 6 is TGS Installation.
  • Section 6.1 is General and its applicability is Accepted.
  • Section 6.2 is Typical Installation Principles and its applicability is Accepted.
  • Section 6.3 is Installation Process and its applicability is Accepted.
  • Section 6.4 is Placement of Signs and Devices and its applicability is Accepted.
  • Section 6.4.1 is Two-way road – lane closure and its applicability is Accepted.
  • Section 6.4.2 is Two-way road (lateral shift) and its applicability is Accepted.
  • Section 6.4.3 is Two-way road – lane closure with side roads and its applicability is Accepted.
  • Section 6.4.4 is Multi-lane un-divided road – lane closure and its applicability is Accepted.
  • Section 6.4.5 is Multi-lane divided road – left or right lane closure and its applicability is Accepted.
  • Section 6.5 is Positioning of Signs and Devices and its applicability is Accepted with amendments.
  • Section 6.6 is Typical Locations for Signs and its applicability is Accepted.
  • Section 6.6.1 is Long term and its applicability is Accepted with amendments.
  • Section 6.6.2 is Short term and its applicability is Accepted.
  • Section 6.7 is Orientation of Signs and Devices and its applicability is Accepted.
  • Section 6.8 is Tolerances and its applicability is Accepted with amendments.
  • Section 6.9 is ITS Devices and its applicability is Accepted.
  • Section 7 is TGS Operation and Maintenance.
  • Section 7.1 is General and its applicability is Accepted.
  • Section 7.2 is Before Work Starts and its applicability is Accepted.
  • Section 7.3 is During the Hours of Work and its applicability is Accepted.
  • Section 7.4 is Aftercare – Worksite Arrangements Outside Working Hours and its applicability is Accepted with amendments.
  • Section 7.5 is Record Keeping and its applicability is Accepted.
  • Section 7.6 is Incidents and its applicability is Accepted.
  • Section 7.7 is TMI Monitoring and its applicability is Accepted.
  • Section 7.8 is Monitor and Measure TTM and its applicability is Accepted.
  • Section 7.9 is Excessive or Inappropriate Use of Temporary Speed Limits and its applicability is Accepted.
  • Section 7.10 is Excessive Signage and its applicability is Accepted.
  • Section 7.11 is Near misses and its applicability is New.
  • Section 8 is TGS Removal.
  • Section 8.1 is General and its applicability is Accepted.
  • Section 8.2 is Typical Removal Principles and its applicability is Accepted.
  • Section 8.3 is Removal Process and its applicability is Accepted.
  • Section 8.4 is Removal Order for Signs and Devices and its applicability is Accepted.
  • Section 8.4.1 is Two-way road – lane closure and its applicability is Accepted.
  • Section 8.4.2 is Two-way road – lateral shift and its applicability is Accepted.
  • Section 8.4.3 is Two-way road – lane closure with side road intersections and its applicability is Accepted.
  • Section 8.4.4 is Multi-lane un-divided road – lane closure and its applicability is Accepted.
  • Section 8.4.5 is Multi-lane divided road – left or right lane closure and its applicability is Accepted.
  • Section 9 is Low Light Works.
  • Section 9.1 is Activity During Low Light and its applicability is Accepted.
  • Section 9.2 is Artificial Lighting and its applicability is Accepted.
  • Section 10 is Unattended Sites and its applicability is Accepted.
  • Appendices: Section A is Sample TTM Career Path Stages and its applicability is Accepted.
  • Appendices: Section B is Sample Risk Assessment Form and its applicability is Accepted.
  • Appendices: Section C is Sample Toolbox Talk and its applicability is Accepted.
  • Appendices: Section 1 is On Site Traffic Guidance Schemes and its applicability is Accepted.
  • Appendices: Section 2 is Assessment of Site Factors: and its applicability is Accepted.
  • Appendices: Section 3 is Assessment of Work Procedure Factors: and its applicability is Accepted.
  • Appendices: Section 4 is Also Consider: and its applicability is Accepted.
  • Appendices: Section 5 is Emergency Preparedness and its applicability is Accepted.
  • Appendices: Section 6 is On Site Traffic Control Tips and its applicability is Accepted.
  • Appendices: Complete and attach Toolbox Meeting Form and process as per company policy, and its applicability is Accepted.
  • Appendices: Section D is Sample Daily Traffic Management Diary and its applicability is Accepted.
Source: QGTTM Part 6 · page 5 Open PDF at this page Search this document