Relationship table (harmonised to AGTTM06-21 Edition 1.1)#
| Section | Description | Applicability |
|---|---|---|
| 1 | Introduction | |
| 1.1 | Purpose | Accepted |
| 1.2 | Structure of AGTTM | Accepted |
| 1.3 | Scope of Part 6 | Accepted |
| 1.4 | Field Work for Office-based Staff | Accepted |
| 1.5 | Application of Part 6 to New Zealand | Accepted |
| 1.6 | Acronyms | Accepted |
| 1.7 | Definitions | Accepted |
| 2 | TTM Principles and Road Categories | |
| 2.1 | TTM Principles | Accepted |
| 2.1.1 | Fundamentals | Accepted |
| 2.1.2 | Basic principles | Accepted |
| 2.2 | Traffic Management Implementer | Accepted |
| 2.3 | Road Categorisation | Accepted |
| 3 | Roles and Responsibilities | |
| 3.1 | TTM Roles | Accepted |
| 3.1.1 | Other TTM workers | Accepted |
| 3.2 | Example – Career Path Progression | Accepted |
| 3.3 | TTM Relationships | Accepted |
| 3.3.1 | Principal Contractor – TTM responsibilities | Accepted |
| 3.3.2 | TMD | Accepted |
| 3.3.3 | TMI responsibilities for TTM on a worksite include: | Accepted with amendments |
| 3.3.4 | Interactions between the Principal Contractor and the TMI | Accepted |
| 3.3.5 | TMI – TC / Other TTM worker interactions | Accepted |
| 3.3.6 | Traffic Controller (TC) | Accepted |
| 3.3.7 | Other TTM workers | Accepted |
| 4 | Pre-Shift Activities | |
| 4.1 | General | Accepted |
| 4.2 | Vehicle Checks | Accepted |
| 4.3 | Job Pack Check | Accepted |
| 4.4 | Equipment and Devices | Accepted |
| 4.5 | Condition of Devices | Accepted |
| 4.5.1 | Cleanliness | Accepted |
| 4.5.2 | Colour of fluorescent signs | Accepted |
| 4.5.3 | Low light visibility | Accepted |
| 4.6 | Resources | Accepted |
| 5 | Pre-start | |
| 5.1 | General | Accepted |
| 5.1.1 | Identify hazards | Accepted |
| 5.1.2 | Assess the risk | Accepted |
| 5.1.3 | Implement controls | Accepted |
| 5.1.4 | Monitor and review | Accepted |
| 5.2 | TMP and TGS Development – Residual Risk Register | Accepted |
| 5.3 | On Site Safety Analysis and Risk Assessment | Accepted |
| 5.4 | Toolbox Talks | Accepted |
| 5.4.1 | TTM staff | Accepted |
| 5.4.2 | Construction workers / visitors | Accepted |
| 6 | TGS Installation | |
| 6.1 | General | Accepted |
| 6.2 | Typical Installation Principles | Accepted |
| 6.3 | Installation Process | Accepted |
| 6.4 | Placement of Signs and Devices | Accepted |
| 6.4.1 | Two-way road – lane closure | Accepted |
| 6.4.2 | Two-way road (lateral shift) | Accepted |
| 6.4.3 | Two-way road – lane closure with side roads | Accepted |
| 6.4.4 | Multi-lane un-divided road – lane closure | Accepted |
| 6.4.5 | Multi-lane divided road – left or right lane closure | Accepted |
| 6.5 | Positioning of Signs and Devices | Accepted with amendments |
| 6.6 | Typical Locations for Signs | Accepted |
| 6.6.1 | Long term | Accepted with amendments |
| 6.6.2 | Short term | Accepted |
| 6.7 | Orientation of Signs and Devices | Accepted |
| 6.8 | Tolerances | Accepted with amendments |
| 6.9 | ITS Devices | Accepted |
| 7 | TGS Operation and Maintenance | |
| 7.1 | General | Accepted |
| 7.2 | Before Work Starts | Accepted |
| 7.3 | During the Hours of Work | Accepted |
| 7.4 | Aftercare – Worksite Arrangements Outside Working Hours | Accepted with amendments |
| 7.5 | Record Keeping | Accepted |
| 7.6 | Incidents | Accepted |
| 7.7 | TMI Monitoring | Accepted |
| 7.8 | Monitor and Measure TTM | Accepted |
| 7.9 | Excessive or Inappropriate Use of Temporary Speed Limits | Accepted |
| 7.10 | Excessive Signage | Accepted |
| 7.11 | Near misses | New |
| 8 | TGS Removal | |
| 8.1 | General | Accepted |
| 8.2 | Typical Removal Principles | Accepted |
| 8.3 | Removal Process | Accepted |
| 8.4 | Removal Order for Signs and Devices | Accepted |
| 8.4.1 | Two-way road – lane closure | Accepted |
| 8.4.2 | Two-way road – lateral shift | Accepted |
| 8.4.3 | Two-way road – lane closure with side road intersections | Accepted |
| 8.4.4 | Multi-lane un-divided road – lane closure | Accepted |
| 8.4.5 | Multi-lane divided road – left or right lane closure | Accepted |
| 9 | Low Light Works | |
| 9.1 | Activity During Low Light | Accepted |
| 9.2 | Artificial Lighting | Accepted |
| 10 | Unattended Sites | |
| Accepted | ||
| Appendices | ||
| A | Sample TTM Career Path Stages | Accepted |
| B | Sample Risk Assessment Form | Accepted |
| C | Sample Toolbox Talk | Accepted |
| 1 | On Site Traffic Guidance Schemes | Accepted |
| 2 | Assessment of Site Factors: | Accepted |
| 3 | Assessment of Work Procedure Factors: | Accepted |
| 4 | Also Consider: | Accepted |
| 5 | Emergency Preparedness | Accepted |
| 6 | On Site Traffic Control Tips | Accepted |
| Complete and attach Toolbox Meeting Form and process as per company policy. | Accepted | |
| D | Sample Daily Traffic Management Diary | Accepted |
Table in words
- Section 1 is Introduction.
- Section 1.1 is Purpose and its applicability is Accepted.
- Section 1.2 is Structure of AGTTM and its applicability is Accepted.
- Section 1.3 is Scope of Part 6 and its applicability is Accepted.
- Section 1.4 is Field Work for Office-based Staff and its applicability is Accepted.
- Section 1.5 is Application of Part 6 to New Zealand and its applicability is Accepted.
- Section 1.6 is Acronyms and its applicability is Accepted.
- Section 1.7 is Definitions and its applicability is Accepted.
- Section 2 is TTM Principles and Road Categories.
- Section 2.1 is TTM Principles and its applicability is Accepted.
- Section 2.1.1 is Fundamentals and its applicability is Accepted.
- Section 2.1.2 is Basic principles and its applicability is Accepted.
- Section 2.2 is Traffic Management Implementer and its applicability is Accepted.
- Section 2.3 is Road Categorisation and its applicability is Accepted.
- Section 3 is Roles and Responsibilities.
- Section 3.1 is TTM Roles and its applicability is Accepted.
- Section 3.1.1 is Other TTM workers and its applicability is Accepted.
- Section 3.2 is Example – Career Path Progression and its applicability is Accepted.
- Section 3.3 is TTM Relationships and its applicability is Accepted.
- Section 3.3.1 is Principal Contractor – TTM responsibilities and its applicability is Accepted.
- Section 3.3.2 is TMD and its applicability is Accepted.
- Section 3.3.3 is TMI responsibilities for TTM on a worksite include: and its applicability is Accepted with amendments.
- Section 3.3.4 is Interactions between the Principal Contractor and the TMI and its applicability is Accepted.
- Section 3.3.5 is TMI – TC / Other TTM worker interactions and its applicability is Accepted.
- Section 3.3.6 is Traffic Controller (TC) and its applicability is Accepted.
- Section 3.3.7 is Other TTM workers and its applicability is Accepted.
- Section 4 is Pre-Shift Activities.
- Section 4.1 is General and its applicability is Accepted.
- Section 4.2 is Vehicle Checks and its applicability is Accepted.
- Section 4.3 is Job Pack Check and its applicability is Accepted.
- Section 4.4 is Equipment and Devices and its applicability is Accepted.
- Section 4.5 is Condition of Devices and its applicability is Accepted.
- Section 4.5.1 is Cleanliness and its applicability is Accepted.
- Section 4.5.2 is Colour of fluorescent signs and its applicability is Accepted.
- Section 4.5.3 is Low light visibility and its applicability is Accepted.
- Section 4.6 is Resources and its applicability is Accepted.
- Section 5 is Pre-start.
- Section 5.1 is General and its applicability is Accepted.
- Section 5.1.1 is Identify hazards and its applicability is Accepted.
- Section 5.1.2 is Assess the risk and its applicability is Accepted.
- Section 5.1.3 is Implement controls and its applicability is Accepted.
- Section 5.1.4 is Monitor and review and its applicability is Accepted.
- Section 5.2 is TMP and TGS Development – Residual Risk Register and its applicability is Accepted.
- Section 5.3 is On Site Safety Analysis and Risk Assessment and its applicability is Accepted.
- Section 5.4 is Toolbox Talks and its applicability is Accepted.
- Section 5.4.1 is TTM staff and its applicability is Accepted.
- Section 5.4.2 is Construction workers / visitors and its applicability is Accepted.
- Section 6 is TGS Installation.
- Section 6.1 is General and its applicability is Accepted.
- Section 6.2 is Typical Installation Principles and its applicability is Accepted.
- Section 6.3 is Installation Process and its applicability is Accepted.
- Section 6.4 is Placement of Signs and Devices and its applicability is Accepted.
- Section 6.4.1 is Two-way road – lane closure and its applicability is Accepted.
- Section 6.4.2 is Two-way road (lateral shift) and its applicability is Accepted.
- Section 6.4.3 is Two-way road – lane closure with side roads and its applicability is Accepted.
- Section 6.4.4 is Multi-lane un-divided road – lane closure and its applicability is Accepted.
- Section 6.4.5 is Multi-lane divided road – left or right lane closure and its applicability is Accepted.
- Section 6.5 is Positioning of Signs and Devices and its applicability is Accepted with amendments.
- Section 6.6 is Typical Locations for Signs and its applicability is Accepted.
- Section 6.6.1 is Long term and its applicability is Accepted with amendments.
- Section 6.6.2 is Short term and its applicability is Accepted.
- Section 6.7 is Orientation of Signs and Devices and its applicability is Accepted.
- Section 6.8 is Tolerances and its applicability is Accepted with amendments.
- Section 6.9 is ITS Devices and its applicability is Accepted.
- Section 7 is TGS Operation and Maintenance.
- Section 7.1 is General and its applicability is Accepted.
- Section 7.2 is Before Work Starts and its applicability is Accepted.
- Section 7.3 is During the Hours of Work and its applicability is Accepted.
- Section 7.4 is Aftercare – Worksite Arrangements Outside Working Hours and its applicability is Accepted with amendments.
- Section 7.5 is Record Keeping and its applicability is Accepted.
- Section 7.6 is Incidents and its applicability is Accepted.
- Section 7.7 is TMI Monitoring and its applicability is Accepted.
- Section 7.8 is Monitor and Measure TTM and its applicability is Accepted.
- Section 7.9 is Excessive or Inappropriate Use of Temporary Speed Limits and its applicability is Accepted.
- Section 7.10 is Excessive Signage and its applicability is Accepted.
- Section 7.11 is Near misses and its applicability is New.
- Section 8 is TGS Removal.
- Section 8.1 is General and its applicability is Accepted.
- Section 8.2 is Typical Removal Principles and its applicability is Accepted.
- Section 8.3 is Removal Process and its applicability is Accepted.
- Section 8.4 is Removal Order for Signs and Devices and its applicability is Accepted.
- Section 8.4.1 is Two-way road – lane closure and its applicability is Accepted.
- Section 8.4.2 is Two-way road – lateral shift and its applicability is Accepted.
- Section 8.4.3 is Two-way road – lane closure with side road intersections and its applicability is Accepted.
- Section 8.4.4 is Multi-lane un-divided road – lane closure and its applicability is Accepted.
- Section 8.4.5 is Multi-lane divided road – left or right lane closure and its applicability is Accepted.
- Section 9 is Low Light Works.
- Section 9.1 is Activity During Low Light and its applicability is Accepted.
- Section 9.2 is Artificial Lighting and its applicability is Accepted.
- Section 10 is Unattended Sites and its applicability is Accepted.
- Appendices: Section A is Sample TTM Career Path Stages and its applicability is Accepted.
- Appendices: Section B is Sample Risk Assessment Form and its applicability is Accepted.
- Appendices: Section C is Sample Toolbox Talk and its applicability is Accepted.
- Appendices: Section 1 is On Site Traffic Guidance Schemes and its applicability is Accepted.
- Appendices: Section 2 is Assessment of Site Factors: and its applicability is Accepted.
- Appendices: Section 3 is Assessment of Work Procedure Factors: and its applicability is Accepted.
- Appendices: Section 4 is Also Consider: and its applicability is Accepted.
- Appendices: Section 5 is Emergency Preparedness and its applicability is Accepted.
- Appendices: Section 6 is On Site Traffic Control Tips and its applicability is Accepted.
- Appendices: Complete and attach Toolbox Meeting Form and process as per company policy, and its applicability is Accepted.
- Appendices: Section D is Sample Daily Traffic Management Diary and its applicability is Accepted.