12Type-2 Documentation Requirements#
Each PTSS shall be supplied with documentation for training, configuration, operation and maintenance detailing how to safely use the system. As a minimum it shall detail:
- a)safe transportation of the PTSU
- b)on-site installation
- c)suitable locations for installation
- d)setting up of the PTSS for operation
- e)HRC operation
- f)starting up
- g)shutting down
- h)safe manual handling procedures for the batteries
- i)routine and preventative maintenance
- j)troubleshooting
- k)Workplace Health and Safety (WH&S) requirements
- l)specific details and calculations of the battery size. The documentation provided on the solar system shall contain all the applicable elements provided in the worked example of Appendix A of AS/NZS 4509.2. The manufacturer specification sheet of the photovoltaic array, batteries and battery charger / regulator shall be provided.
- m)the limiting distance for reliable operation of the communications link.