4Quality system requirements#

4.1Hold Points, Witness Points and Milestones#

General requirements for Hold Points, Witness Points and Milestones are specified in Clause 5.2 of MRTS01 Introduction to Technical Specifications. The quality system requirements defined in MRTS201 General Equipment Requirements apply to this Technical Specification. Additional Hold Points and Witness Points applicable to this Technical Specification are summarised in Table 4. There are no Milestones defined.

Table 4 – Hold Points, Witness Points and Milestones
ClauseHold PointWitness PointMilestone
4.21. Samples for acceptance (design). 2. Photometric performance certification.
5.13. Barrow, tripod or trailer support structure design documentation. 4. Detailed design documentation of the electrical wiring including charging assembly and calculations, signed by an RPEQ.
5.2.1 5.2.21. Factory Acceptance Test. 2. Boom Barrier Demonstration. 3. Australian Communications and Media Authority Compliance. 4. Site Acceptance Test.

4.2Samples for acceptance#

The requirements of MRTS201 General Equipment Requirements apply to this Technical Specification. A sample PTSS for acceptance and photometric performance certification shall be provided 28 days prior to manufacture.

Hold Point 1
Hold Point 2

Detailed designs of the PTSS layout, fabrication and assembly drawings, calculations, specifications and certifications of the PTSS and associated components (signed by the Contractor’s RPEQ) shall be submitted to the Principal via the Administrator for verification prior to manufacture.

Drawings from the original pages

Source: MRTS267 · pages 6–7 Open PDF at this page Search this document