6Signing considerations#

Project signs shall be installed when the following are met:

  1. a)if their use is specified in the contractual documents
  2. b)if their use is specified in the funding stream requirements, and
  3. c)to meet specific departmental requirements.

Where Item 6c) applies, the Transport and Main Roads region may consider a number of factors, including:

  1. i.the significance and/or importance of the project to the community
  2. ii.overall project cost
  3. iii.level of recognition expected for the project
  4. iv.presence of other signs
  5. v.availability of suitable mounting / installation locations
  6. vi.whether the installation of project recognition signs creates a safety hazard
  7. vii.vandalism risk, and
  8. viii.other factors considered appropriate in the circumstances.