March 2024#

VolumePartSectionChange typeDescription of change
48AllAmendedAlignment with the current AS/NZS 3000 and AS 3017 (TRUM Vol 4 Part 8).
115 min-Load added as a field (Electrical CoT) - This could be implemented using a clamp meter to measure current or using a power meter.
4ELV fault loop impedance added (d.c. resistance measurement) (CoT).
5Introduction of ELV into EFLI calculations tables (TRUM Vol 4 Part 8).
5Introduction of 2A fuse in EFLI calculations, used in Traffic Signal Controllers (TRUM Vol 4 Part 8).

Drawings from the original pages

Source: TRUM Amendment Register · page 1 Open PDF at this page Search this document