Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›TRUM Vol 1 Part 3
TRUM Vol 1 Part 3

Contents

  • 2Traffic studies and surveys
  • 2.5.3-1Travel time on large projects
  • 1Travel time surveys on large projects
  • 2Travel time data methodologies
  • 3Data records
  • 4Auditing and record keeping

1Travel time surveys on large projects#

This supplement is also to be read and used in conjunction with the Transport and Main Roads Technical Specification MRTS02. It provides guidelines to practitioners for conducting travel time surveys on large roadwork projects.

Source: TRUM Vol 1 Part 3 · page 4 Open PDF at this page Search this document
← Previous2.5.3-1 Travel time on large projects Next →2 Travel time data methodologies
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.