Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›TRUM Vol 1 Part 3
TRUM Vol 1 Part 3

Contents

  • 2Traffic studies and surveys
  • 2.5.3-1Travel time on large projects
  • 1Travel time surveys on large projects
  • 2Travel time data methodologies
  • 3Data records
  • 4Auditing and record keeping

2Travel time data methodologies#

The preferred methodologies fork travel time surveys to be applied on the department’s projects are:

  • Floating car method – GPS technology GPS accuracy ± 5 m Track log 1-second intervals
  • Path Trace Method – Bluetooth technology
Source: TRUM Vol 1 Part 3 · page 4 Open PDF at this page Search this document
← Previous1 Travel time surveys on large projects Next →3 Data records
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.