Queensland Guide to Temporary Traffic Management – Part 5: Short-Term Low-Impact Worksites
Department of Transport and Main Roads · November 2025
Start reading
Search this document
Open PDF
Official source ↗
Pages
41
Sections
75
Searchable sentences
518
Status
Current
Contents
Copyright
p. 2
Licence
p. 2
CC BY licence summary statement
p. 2
Translating and interpreting assistance
p. 2
Disclaimer
p. 2
Feedback
p. 2
About this document
p. 3
How to use this document
p. 3
References
p. 4
Relationship table (harmonised to AGTTM05-21 Edition 1.1)
p. 5
1
Introduction
p. 12
1.3
Scope of Part 5
p. 12
2
Design process
p. 12
2.1
General
p. 12
2.2
Risk assessment
p. 13
2.4
Essential design principles
p. 13
2.4.2
Signs
p. 13
2.4.4
Lane width
p. 14
2.5
Variations to design
p. 14
3
General considerations
p. 14
3.1
Restrictions on use
p. 14
3.2
Short-term low-impact options
p. 15
3.4
Vehicle Mounted Warning Device
p. 16
3.5
Lookout protection method
p. 17
3.6
Combining different works protection methods
p. 17
4
Works on road – within traffic lane
p. 18
4.1
Work protected by specialist vehicles
p. 18
4.1.2
Truck-mounted attenuators
p. 18
4.2
Works between gaps in traffic
p. 18
4.2.2
Criteria
p. 18
4.2.3
Traffic control devices
p. 18
4.2.4
Pre-installation processes
p. 18
4.2.5
Installation (TGS instruction)
p. 19
4.3
Short term works in traffic
p. 19
4.3.3
Traffic control devices
p. 19
4.3.4
Pre-installation processes
p. 19
4.3.5
Installation (TGS instruction)
p. 20
4.4
Frequently changing work area – in lane
p. 21
4.4.1
Description
p. 21
4.4.3
Traffic control devices
p. 21
4.4.5
Installation (TGS instruction)
p. 21
4.5
Constantly moving work area – in lane
p. 22
4.5.1
Description
p. 22
4.5.2
Criteria
p. 22
4.5.3
Traffic control devices
p. 22
4.5.5
Installation (TGS instruction)
p. 23
5
Works outside of traffic lane
p. 24
5.1
Shoulders, medians, verges and footpaths with workers on foot or small plant items only
p. 24
5.1.3
Traffic control devices
p. 24
5.1.4
Pre-installation processes
p. 24
5.1.5
Installation (TGS instruction)
p. 25
5.2
Shoulders, medians, verges and footpaths with large plant items only
p. 26
5.2.3
Traffic control devices
p. 26
5.2.4
Pre-installation processes
p. 26
5.2.5
Installation (TGS instruction)
p. 27
5.3
Frequently changing work area outside of a traffic lane
p. 28
5.3.1
Description
p. 28
5.3.3
Traffic control devices
p. 28
5.3.4
Pre-installation processes
p. 28
5.3.5
Installation (TGS instruction)
p. 28
5.4
Short term works outside of a traffic lane
p. 30
5.4.1
Description
p. 30
5.4.2
Criteria
p. 31
5.4.3
Traffic control devices
p. 33
5.4.4
Pre-installation processes
p. 33
5.4.5
Installation (TGS instruction)
p. 34
Operation
p. 34
5.4.6
Close out process
p. 36
Daily records
p. 36
Incidents
p. 36
6
Investigations, inspections, road lighting or signal works
p. 36
6.1
Investigations and inspections
p. 36
6.1.1
Description and criteria
p. 36
6.2
Road lighting or signal works
p. 38
6.2.1
Description and criteria
p. 38