1Introduction#

1.3Scope of Part 5#

Difference

Replace:

AGTTM Part 5 provides guidance to designers on TTM at road worksites. This design is typically prepared in the form of a traffic guidance scheme (TGS) which is subsequently applied by field staff when installing these schemes at road worksites.

with:

QGTTM Part 5 provides guidance for a range of TTM professionals including Traffic Management Designers (TMD), Traffic Management Implementers (TMI) and TTM workers with Working in Proximity to Traffic Awareness – Part 2 competency as follows:

  • A TMD may be required to prepare / design a TGS in accordance with the provisions in this Part, which is subsequently applied by field staff when installing these schemes at road worksites. TGS designs for short-term low-impact works) may form part of a generic TGS selection system designed by the TMD.
  • When implementing or removing a TGS, a TMI will select, design, and use one of the work protection methods outlined in this Part.
  • TTM workers with Working in Proximity to Traffic Awareness – Part 2 competency, may also select, design, and implement the works protection methods (excluding activities involving grading, protection by a shadow vehicle, or Sections 4.1, 4.4 and 4.5) outlined in this Part. Also refer to QGTTM Part 8 Table A7.
Source: QGTTM Part 5 · page 12 Open PDF at this page Search this document