Relationship table (harmonised to AGTTM08-19 Edition 1.0)#

SectionDescriptionApplicability
1Introduction
1.1PurposeAccepted
1.2Structure of AGTTMAccepted
1.3Scope of Part 8Accepted
1.4Application of Part 8 to New ZealandAccepted
1.5AcronymsAccepted
1.6DefinitionsAccepted
2Road categories for temporary traffic management
2.1GeneralAccepted
2.2Default TTM road categoriesAccepted, with amendments
2.3Project specific amendments to TTM road categoriesAccepted
2.4Road categories map for QueenslandNew
3Process for TGS selection
3.1GeneralAccepted
3.2Generic TGSAccepted, with amendments
3.3Site suitable TGSAccepted, with amendments
3.4Site specific TGSAccepted
3.5TGS type selectionAccepted, with amendments
4TTM approval activities
5Powers, roles and responsibilities
5.1Legislative contextAccepted
5.2Statutory health and safety responsibilities – duty of careAccepted
5.3Application of the Parts of AGTTMAccepted
5.4Roles and responsibilitiesAccepted, with amendments
5.5Roles and responsibilities for special applicationsAccepted
SectionDescriptionApplicability
5.5.1Road safety barrier systemsAccepted with amendments
5.5.2Austroads Safety Hardware Training and Accreditation Scheme (ASHTAS)New
5.6Supervising a Traffic Controller (TC) in trainingNew
6TTM training frameworkAccepted, with amendments
6.1Application of TTM training frameworkAccepted, with amendments
6.2Training rolesAccepted, with amendments
6.3Training by road categoryAccepted, with amendments
6.4Training – generalAccepted, with amendments
6.4.1CompetenciesAccepted, with amendments
6.4.2AssessmentAccepted, with amendments
6.5Traffic controllerAccepted, with amendments
6.5.1Training by road categoryAccepted, with amendments
6.5.2CompetenciesAccepted, with amendments
6.5.3Progression between categoriesAccepted, with amendments
6.6Traffic management implementerAccepted, with amendments
6.6.1Training by road categoryAccepted, with amendments
6.6.2CompetenciesAccepted, with amendments
6.6.3Progression between categoriesAccepted, with amendments
6.7Traffic management designerAccepted, with amendments
SectionDescriptionApplicability
6.7.1Training by road categoryAccepted, with amendments
6.7.2CompetenciesAccepted, with amendments
6.7.3Progression between categoriesAccepted, with amendments
6.8Practitioner and non-practitioner statusAccepted, with amendments
6.9Maintenance of qualification currencyAccepted, with amendments
7Standard forms
8Model contract specification
Appendices
ATTM roles – additional tasks and activitiesAccepted, with amendments
Table A1: EngineerAccepted
Table A2: Project managerAccepted
Table A3: Traffic management designerAccepted
Table A4: Traffic controllerAccepted
Table A5: Traffic management implementerAccepted with amendments
Table A6: Principal contractorAccepted
Table A7: Traffic management workerAccepted, with amendments
BStandard forms – examples
B.1Form B.1 – TMP suitability checklistAccepted
B.2Form B2 – Traffic management for roadworks operational check / onsite pre-opening inspection – checklistAccepted
B.3Form B3 – Worksite traffic management – hierarchy of safety controls – checklistsAccepted
B.3.1Using the checklistAccepted
B.3.2Form B3 – CHECKLIST PART A – Traffic controls assessmentAccepted
B.3.3Form B3 – CHECKLIST Part B – Justification for control selectionAccepted
SectionDescriptionApplicability
B.3.4Form B3 – CHECKLIST Part C – Additional site-specific safety hazard / risk factorsAccepted
B.4Form B4 – TMP daily traffic management diaryAccepted
B.5Form B.5 – Traffic Management Plan (TMP) – long formAccepted
B.6Form B.6 – Design exceptionAccepted
B.7Form B.7 – Example of site condition rating (SCR) form – compliance inspectionAccepted
B.8Form B.8 – Example of site condition rating (SCR) form – compliance inspection – short formAccepted
B.8.1Examples of ratings (short audit)Accepted
B.9Form B.9 – Example of notice of non-conformanceAccepted
B.10Form B.10 – Example of notification of road closure / lane closureAccepted
B.11Form B.11 – Report on incident at roadworks siteAccepted
B.12Form B.12 – Newspaper advertisement standardAccepted
CSample temporary traffic management specification template local government roads
C.1SpecificationAccepted
C.1.1Location and description of workAccepted
C.1.2Extent of workAccepted
C.1.3Setting out the worksAccepted
C.1.4Scope of workAccepted
C.1.5Traffic guidance scheme (TGS)Accepted
C.1.6Record keeping and audit requirementsAccepted
C.1.7Emergency and public transport vehiclesAccepted
C.1.8Numbers of traffic controllersAccepted
C.1.9Traffic management plansAccepted
C.1.10Arrangement of traffic control devicesAccepted
C.1.11Adequate traffic control devicesAccepted
C.1.12Opening completed workAccepted
C.1.13Use of 40 km/h speed zoningAccepted
C.1.14Flashing arrow signsAccepted
C.1.15Message boardsAccepted
C.1.16Water filled delineators and crash barriersAccepted
C.1.17Barrier boardsAccepted
C.1.18Cones and bollardsAccepted
C.1.19Traffic signalsAccepted
C.1.20Devices to be safely supportedAccepted
C.1.21Permanent traffic signalsAccepted
C.1.22Alternative dutiesAccepted
C.1.23Control of worksitesAccepted
C.1.24Compliance with standards, handbooks and guidesAccepted
C.1.25SafetyAccepted
DSample temporary traffic management specification template State / Territory Government roads
D.1ScopeAccepted
D.1.1GeneralAccepted
D.1.2Traffic management planAccepted
D.2Temporary traffic management (TTM) personnelAccepted
D.2.1Authority to direct trafficAccepted
D.2.2Traffic management implementerAccepted
D.3Planning and designAccepted
D.3.1GeneralAccepted
D.3.2Hazard identification, risk assessment and controlAccepted
D.3.3Objective and targetsAccepted
D.3.4Temporary speed zoningAccepted
D.3.5Least possible disruptionAccepted
D.3.6Maintain access to adjoining properties and side roadsAccepted
D.4Road occupancy licenceAccepted
D.4.1Road occupancy licence applicationAccepted
D.4.2Road occupancy feesAccepted
D.4.3Licence conditionsAccepted
D.5Traffic management plan (TMP)Accepted
D.5.1Plan submissionAccepted
SectionDescriptionApplicability
D.5.2Required elementsAccepted
D.5.3Plan preparationAccepted
D.5.4Contractor's responsibilityAccepted
D.6Traffic staging plansAccepted
D.6.1GeneralAccepted
D.6.2Required detailsAccepted
D.6.3Safety barriersAccepted
D.7Traffic Guidance SchemesAccepted
D.7.1Plan submissionAccepted
D.7.2Generic traffic guidance schemesAccepted
D.7.3Project specific traffic guidance schemesAccepted
D.7.4Required detailsAccepted
D.8Vehicle movement plans and pedestrian movement plansAccepted
D.8.1Vehicle movement plansAccepted
D.8.2Pedestrian movement plansAccepted
D.9Road safety audit of TMPsAccepted
D.10Traffic management risk assessment workshopAccepted
D.10.1GeneralAccepted
D.10.2Content of workshopAccepted
D.10.3ParticipantsAccepted
D.10.4Close out identified risk issuesAccepted
D.11Temporary roadways and detoursAccepted
D.11.1Construction of temporary roadways and detoursAccepted
D.11.2Opening temporary roadways and detours to trafficAccepted
D.11.3Road safety audit of temporary roadways or detoursAccepted
D.11.4Removal of temporary roadways and detoursAccepted
D.12Traffic control devicesAccepted
D.12.1Safety barriersAccepted
D.12.2Pavement markings and signsAccepted
D.12.3Portable variable message signsAccepted
D.12.4Radar activated speed signsAccepted
SectionDescriptionApplicability
D.12.5Temporary traffic signalsAccepted
D.13Monitoring of traffic control measuresAccepted
D.13.1CommunicationAccepted
D.13.2Emergency preparedness and responseAccepted
D.13.3Incident investigation, corrective and preventative actionAccepted
D.14Side-tracks and detoursAccepted
D.15Opening to traffic upon completionAccepted