12Period Contracts#

This Clause 12 only applies if the pavement marking is being performed under the Line marking Maintenance Contract.

The Contractor must monitor the pavement marking and test it at the times specified in Annexure B. If the retroreflectivity is below that specified in Annexure B, the Contractor must reapply the pavement marking in accordance with this Technical Specification.

Audio tactile pavement markings must be replaced where:

  • a) edge lines are distorted in shape or lose shape due to wear, such that the height of individual ribs are less than 5 mm above the adjacent road surface, over more than 36 m continuous or 25% of any 300 m lane length, or
  • b) ribs have shattered or no longer adhere to the road surface over more than 10 m continuous or 15% of any 300 m lane length.
Source: MRTS45 · pages 23–24 Open PDF at this page Search this document