Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›MRTS45
MRTS45

Contents

  • Technical Specification
  • Transport and Main Roads Specifications
  • MRTS45 Road Surface Delineation
  • November 2025
  • Copyright
  • About this document
  • How to use this document
  • Terminology
  • 1Scope
  • 2Definitions
  • 3Referenced documents
  • 4Quality system requirements
  • 5Materials
  • 6Equipment for the application of pavement marking
  • 7Protection of people, property and the environment
  • 8Application
  • 9Position tolerances
  • 10Temporary pavement markers (FLAPS)
  • 11Redundant pavement markings
  • 12Period Contracts
  • 13Acceptance of work
  • 14Performance criteria
  • 15Records
  • 16Supplementary requirements
  • Appendix ASummary of Hold Points, Witness Points, Milestones and Records
  • Annexure BDry retroreflectivity

15Records#

The Contractor must record the location, weather conditions and type of line marking applied each day and provide these records to the Administrator within 10 days. The records must identify any regulatory pavement marking installed. Record

Source: MRTS45 · page 27 Open PDF at this page Search this document
← Previous14 Performance criteria Next →16 Supplementary requirements
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.