Appendix 1Sample assessment criteria#

Appendix 1: Sample assessment criteria
Road No.ChainSide width gazettalSiteDCF commentsMini safety audit
17C3.85RHSStockpile siteGood. Green Reflectors installed on 5/3/12√
21.01Rogers Creek Stockpile site (LHS)Good. Green Reflectors installed on 5/3/12√
59.19E/B – East of Gore (LHS)Good. Green Reflectors installed on 5/3/12√
65.6(65.36) West of Gore (LHS)Good. Green Reflectors installed on 5/3/12√
71.89East of Chain Ponds (LHS)Good. Green Reflectors installed on 5/3/12√
74.64West of Chain pondsGood. Green Reflectors installed on 6/3/12√
79.17East of Omanana (LHS)Good. Green Reflectors installed on 6/3/12√
105.67East of Inglewood (3x RHS)Good. Green Reflectors installed on 6/3/12√
17D37.29Rest Area east of Yelarbon (RHS)Good. Green Reflectors installed on 6/3/12√
Cunningham Highway (Ipswich to Goondiwindi) – Blue Reflector site assessment for proposed change to Green reflectors
Road No.West boundSite directionTagsComments/description Potential or existing sitesDCF commentsOther’s comments
17C21.01Rogers Creek Stockpile site (LHS)1 set of reflectors missing!Good. Green Reflectors installed on 5/3/12
65.6(65.36) West of Gore (LHS)2 sets of reflectors missing!Good. Green Reflectors installed on 5/3/12
71.89East of Chain Ponds (LHS)1 set of reflectors missing!Good. Green Reflectors installed on 5/3/12
74.64West of Chain ponds2.52 sets of reflectors missing/part missing!Good. Green Reflectors installed on 6/3/12
79.17East of Omanana (LHS)2 sets of reflectors missing!Good. Green Reflectors installed on 6/3/12
Source: TRUM Vol 1 Part 5 · pages 15–16 Open PDF at this page Search this document