Skip to content
TTM WIKI
by
TekSwipe Traffic
Search
Ask AI
Quiz
Library
About
TekSwipe ↗
Search TTM Wiki
Sign in
Library
›
TRUM
TRUM Vol 4 Part 1
TRUM
Current
TRUM Volume 4 (ITS and Electrical Technology Manual) – Part 1: Traffic Signal Maintenance
Department of Transport and Main Roads · April 2015
Start reading
Search this document
Open PDF
Official source ↗
Pages
34
Sections
72
Searchable sentences
583
Status
Current
Contents
Copyright
p. 2
1
Introduction
p. 4
2
Scope
p. 4
3
Abbreviations
p. 4
4
Definition of terms
p. 4
5
General maintenance requirements
p. 5
5.1
Maintenance programs
p. 5
5.2
Applicable standards
p. 5
5.3
Installation drawings
p. 5
5.4
Maintenance personnel
p. 5
5.5
Maintenance plant and equipment
p. 5
5.6
Maintenance waste disposal
p. 6
5.7
Replacement parts
p. 6
5.8
Traffic management
p. 6
5.9
Reporting requirements
p. 6
5.10
Recording keeping
p. 7
6
Preventative maintenance
p. 7
6.1
Electrical
p. 7
6.1.1
Point of supply maintenance
p. 7
6.1.2
Electrical switchboard maintenance
p. 8
6.1.3
Cable and connection maintenance
p. 8
6.1.4
Pits and conduit maintenance
p. 9
6.1.5
Traffic signal controller maintenance
p. 9
6.1.6
Pushbutton/audio tactile sounder maintenance
p. 10
6.1.7
Lantern/aspect maintenance
p. 10
6.1.8
Other equipment maintenance
p. 10
6.2
Structural
p. 10
6.2.1
Steel pole maintenance
p. 11
6.2.2
Steel post maintenance
p. 11
6.3
Environmental
p. 11
6.3.1
Vegetation management
p. 11
6.3.2
Vermin
p. 11
6.3.3
Maintenance access
p. 12
6.3.4
General tidy up
p. 12
6.3.5
Cleaning and painting
p. 12
7
Routine maintenance
p. 12
8
Response maintenance
p. 12
8.1
Reported faults and damages
p. 12
9
References
p. 14
Appendix A
Traffic signal inventory
p. 15
Inventory on pits and conduits
p. 17
Inventory
p. 17
Inventory on poles/posts
p. 19
Inventory
p. 19
Inventory on lanterns/pushbuttons/audio tactile
p. 21
Inventory
p. 21
Appendix B
Traffic signal maintenance reports
p. 23
Inspection on traffic signal controller
p. 23
Inspections
p. 23
Tests on controller
p. 24
Tests on loops
p. 24
Additional comments:
p. 24
Inspector name:
p. 24
Inspector signature:
p. 24
Inspection date:
p. 24
Inspections on circuits and cables
p. 25
Inspections
p. 25
Tests on consumer mains
p. 25
Tests on multicore signal cables
p. 26
Additional comments:
p. 26
Inspector name:
p. 26
Inspector signature:
p. 26
Inspection date:
p. 26
Inspections on pits and conduits
p. 27
Inspections
p. 27
Inspection on poles/posts
p. 29
Inspections
p. 29
Tests
p. 29
Inspection on lanterns/pushbuttons/audio tactile
p. 31
Inspections
p. 31
Appendix C
Periodic verification
p. 32
Requirements for electrical installations
p. 32