Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›TRUM Vol 4 Part 1
TRUM Vol 4 Part 1

Contents

  • Copyright
  • 1Introduction
  • 2Scope
  • 3Abbreviations
  • 4Definition of terms
  • 5General maintenance requirements
  • 6Preventative maintenance
  • 7Routine maintenance
  • 8Response maintenance
  • 9References
  • Appendix ATraffic signal inventory
  • Appendix BTraffic signal maintenance reports
  • Appendix CPeriodic verification

4Definition of terms#

the Act
Electrical Safety Act 2002, Regulations and Codes of Practice
current (non-electrical)
Current at the time of the maintenance activity
electricity entity
As defined in the Act
electricity works
As defined in the Act
Wiring Rules
AS/NZS 3000 commonly referred to as the Wiring Rules
Source: TRUM Vol 4 Part 1 · page 4 Open PDF at this page Search this document
← Previous3 Abbreviations Next →5 General maintenance requirements
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.