Appendix BTraffic signal maintenance reports#
The following inspection reports are to be produced.
Inspection on traffic signal controller#
| Field | Value |
|---|---|
| Region: | |
| Intersection/site number: | |
| Road No.: | LGA No.: Job No.: |
| Road name: | Suburb: |
| Latitude: | Longitude: |
| Plan No.: | Plan rev.: Rev. date: |
Inspections#
| Item | Pass | Fail | Corrective Action Required | IER | AS | MRTS |
|---|---|---|---|---|---|---|
| Safe location | ||||||
| Safe access (present and future) | ||||||
| Pole guard | ||||||
| Seal against vermin | ||||||
| Conduits sealed | ||||||
| Protection against direct contact | ||||||
| Signs of degradation | ||||||
| Main switch labelled | ||||||
| Protective devices labelled | ||||||
| MEN link | ||||||
| Earth conductor/clamp/stake | ||||||
| Main earth conductor label | ||||||
| Neutral link and label | ||||||
| Drawing/circuit schedule correct | ||||||
| Consumer mains connection correct | ||||||
| Exposed conductors | ||||||
| Suitable IP rating |
Tests on controller#
| Item | Value | Pass | Fail | Corrective Action Required | ||
|---|---|---|---|---|---|---|
| Earth continuity tests | ||||||
| Polarity | ||||||
| Earth Fault Loop Impedance (Ohm) (External EFLI into supply) | ||||||
| RCD on GPO | ||||||
| Maximum Demand (A) | ||||||
| Voltage (V) |
Tests on loops#
| Item | Value | Corrective Action Required | ||
|---|---|---|---|---|
| Detector number | N/A | N/A | ||
| Sensitivity setting | N/A | |||
| Frequency (kHz) | N/A | |||
| Mode (PA) | N/A | |||
| Mode (PR) | N/A | |||
| Inductance (µH) | N/A | |||
| Q/LER | N/A | |||
| Correct loop operation | N/A | Yes | No |
Additional comments:#
Inspector name:#
Inspector signature:#
Inspection date:#
Inspections on circuits and cables#
| Region: | |||
| TSC ID: | |||
| Description: | |||
| Cct ID: | |||
| Description: | |||
| Road No.: | LGA No.: | Job No.: | |
| Road name: | Suburb: | ||
| Latitude: | Longitude: | ||
| Plan No.: | Plan rev.: | Rev. date: |
Inspections#
| Item | Pass | Fail | Corrective Action Required | ||
|---|---|---|---|---|---|
| Correctly terminated | |||||
| Correctly labelled | |||||
| Correct colour coding | |||||
| Signs of degradation | |||||
| Cable protection type/size | |||||
| Drawing correct | |||||
| Correct circuit connections |
Tests on consumer mains#
| Item | Value | Pass | Fail | Corrective Action Required | ||
|---|---|---|---|---|---|---|
| Earth continuity tests | ||||||
| Polarity | ||||||
| Earth leakage testing | ||||||
| Earth Fault Loop Impedance (Ohm) |
Tests on multicore signal cables#
| Item | Value | Pass | Fail | Corrective Action Required | ||
|---|---|---|---|---|---|---|
| Earth leakage (mA) | ||||||
| Earth continuity | ||||||
| Earth fault loop impedance (Ohm) |
Additional comments:#
Inspector name:#
Inspector signature:#
Inspection date:#
Inspections on pits and conduits#
| Region: | |||
| Intersection/site number: | |||
| Pit ID: | |||
| Description: | |||
| Pit connected to: | Switchboard Traffic signal pole Other | ||
| Road No.: | LGA No.: | Job No.: | |
| Road name: | Suburb: | ||
| Latitude: | Longitude: | ||
| Plan No.: | Plan rev.: | Rev. date: |
Inspections#
| Item | Pass | Fail | Corrective Action Required | ||
|---|---|---|---|---|---|
| Pit surround | |||||
| Pit level with surrounding surface | |||||
| Earth subsidence round pit | |||||
| Pit wall deflection/damage | |||||
| Pit lid intact | |||||
| Pit marker | |||||
| Pit in suitable location | |||||
| Water in pit | |||||
| Pit clean | |||||
| Conduit depth (mm) | |||||
| Conduit protruding > 100 mm | |||||
| Conduit sealed | |||||
| Drawing correct |
Additional
comments:
Inspector name:
Inspector signature:
Inspection date:
Inspection on poles/posts#
| Field | Value | |
|---|---|---|
| Region: | ||
| Intersection/site number: | ||
| Pole ID: | ||
| Description: | ||
| Road No.: | LGA No.: | Job No.: |
| Road name: | Suburb: | |
| Latitude: | Longitude: | |
| Plan No.: | Plan rev.: | Rev. date: |
Inspections#
| Item | Value | Pass | Fail | Corrective Action Required |
|---|---|---|---|---|
| IER | AS | MRTS | ||
| Distance from HV lines (m) | ||||
| Distance from LV lines (m) | ||||
| Distance from communication lines (m) | ||||
| Proximity to power poles (m) | ||||
| Proximity to trees (m) | ||||
| Clearance from railway lines (m) | ||||
| Clearance from rail OHV (m) | ||||
| Clearance from driveway (m) | ||||
| Clearance from drainage (m) | ||||
| Pole structural integrity | ||||
| Door and screw orientation/ condition | ||||
| Terminal panel | ||||
| Correct conduit installation | ||||
| Correct upper mounting assembly connections | ||||
| Earth connection | ||||
| Drawing correct |
Table in words
- For Distance from HV lines (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Distance from LV lines (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Distance from communication lines (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Proximity to power poles (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Proximity to trees (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Clearance from railway lines (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Clearance from rail OHV (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Clearance from driveway (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Clearance from drainage (m), the value is , the pass is , the fail is , and the corrective action required is .
- For Pole structural integrity, the value is , the pass is , the fail is , and the corrective action required is .
- For Door and screw orientation/ condition, the value is , the pass is , the fail is , and the corrective action required is .
- For Terminal panel, the value is , the pass is , the fail is , and the corrective action required is .
- For Correct conduit installation, the value is , the pass is , the fail is , and the corrective action required is .
- For Correct upper mounting assembly connections, the value is , the pass is , the fail is , and the corrective action required is .
- For Earth connection, the value is , the pass is , the fail is , and the corrective action required is .
- For Drawing correct, the value is , the pass is , the fail is , and the corrective action required is .
Tests#
| Item | Value | Pass | Fail | Corrective Action Required |
|---|---|---|---|---|
| IER | AS | MRTS | ||
| Earth integrity |
Table in words
- For Earth integrity, the value is , the pass is , the fail is , and the corrective action required is .
Additional
comments:
Inspector name:
Inspector signature:
Inspection date:
Inspection on lanterns/pushbuttons/audio tactile#
| Field | Value | |
|---|---|---|
| Region: | ||
| Intersection/site number: | ||
| Pole ID: | ||
| Description: | ||
| Road No.: | LGA No.: | Job No.: |
| Road Name: | Suburb: | |
| Latitude: | Longitude: | |
| Plan No.: | Plan rev.: | Rev. date: |
Inspections#
| Item | Pass | Fail | Corrective Action Required |
|---|---|---|---|
| IER | AS | MRTS | |
| Lantern wiring secure | |||
| Lantern correct operation | |||
| Lantern fixings secure | |||
| Pushbutton earthing | |||
| Pushbutton correct operation | |||
| Pushbutton fixings secure | |||
| Audio tactile earthing | |||
| Audio tactile correct operation | |||
| Audio tactile fixings secure |
Table in words
- For Lantern wiring secure, the pass is , the fail is , and the corrective action required is .
- For Lantern correct operation, the pass is , the fail is , and the corrective action required is .
- For Lantern fixings secure, the pass is , the fail is , and the corrective action required is .
- For Pushbutton earthing, the pass is , the fail is , and the corrective action required is .
- For Pushbutton correct operation, the pass is , the fail is , and the corrective action required is .
- For Pushbutton fixings secure, the pass is , the fail is , and the corrective action required is .
- For Audio tactile earthing, the pass is , the fail is , and the corrective action required is .
- For Audio tactile correct operation, the pass is , the fail is , and the corrective action required is .
- For Audio tactile fixings secure, the pass is , the fail is , and the corrective action required is .
Additional
comments:
Inspector name:
Inspector signature:
Inspection date: