Appendix ATraffic signal inventory#
The following inventory information is to be maintained.
Inventory on traffic signal controller
| Region: | ||
| Intersection/site number: | ||
| Road No.: | LGA No.: | Job No.: |
| Road name: | Suburb: | |
| Latitude: | Longitude: | |
| Plan No.: | Plan rev.: | Rev. date: |
| Point of supply: | Pole No.: | Pillar No.: |
Inventory
| Item | Value |
|---|---|
| Install/replace date: | Install Replace |
| Controller type: | PSC1 PSC2 PSC3 Alpha 16 Eclipse Other |
| Number of signal groups: | 1-8 9-16 17-24 25-32 |
| Top-hat section added: | Yes No |
| Additional equipment installed: | |
| LCB fuse size: | 8A 5A Other |
| LCB type (PSC only): | Normal Low power |
| Number of cable runs: | 1 2 3 4 |
| Multicore cable type: | 6 19 29 36 |
| EFLI modification: | |
| 6A HRC fuse in A2 | Yes No |
| 10A HRC fuse in flashing yellow cct | Yes No |
| Signal group fuses | Yes No |
| Type of earth: | MEN Common earth |
| Location of MEN point: | Ground Pit Pillar box cabinet |
| Type of earth electrode: | Earth Earth Size: 12 mm 16 mm stake plate |
| Labelling of main earth: | Yes No |
- Last audit/inspection outcomes not yet reviewed to determine remedial works
- No work required from last audit/inspection
- Decommissioned
- Design phase
- Tender phase
- Construction phase
- Remedial works certified and completed
Current status with respect to the last audit/inspection:
Additional comments:
Inspector name:
Inspector signature:
Inspection date:
Inventory on pits and conduits#
| Field | Value |
|---|---|
| Region : | |
| Intersection/site number: | |
| Pit ID: | |
| Description: | |
| Pit connected to: | Switchboard Traffic signal post Road lighting pole Other |
| Road No.: | |
| LGA No.: | |
| Job No.: | |
| Road name: | |
| Suburb: | |
| Latitude: | |
| Longitude: | |
| Plan No.: | |
| Plan rev.: | |
| Rev. date: |
Inventory#
| Item | Value |
|---|---|
| Install/replace date: | Install Replace |
| Pit type: | J1 No. 3 No. 4 No. 7 Round |
| Pit material: | Plastic Fibro Concrete Fibreglass Other |
| Asbestos in pit material: | Yes No Possible |
| Pit lid material: | Concrete Plastic Steel |
| Pit lid insulation (steel lid only): | Insulation coating intact Lid to be replaced |
| Asbestos in conduit material: | Yes No Not tested |
| Asbestos contamination in pit: | Yes No Not tested |
| Conduit type: | HD MD Corrugated Other |
| Number of conduits: | |
| Size (mm): | 40 80 50 100 |
| Conduit colour: | Orange White Grey Black |
| Cables in pit: | Lighting Signal Detector Other ITS |
| Slack cable in pit (m)L |
- Last audit/inspection outcomes not yet reviewed to determine remedial works
- No work required from last audit/inspection
- Decommissioned
- Design phase
- Tender phase
- Construction phase
- Remedial works certified and completed
Current status with respect to the last audit/inspection:
Additional comments:
Inspector name:
Inspector signature:
Inspection date:
Inventory on poles/posts#
| Field | Value |
|---|---|
| Region: | |
| Intersection/site number: | |
| Pole ID: | |
| Description: | |
| Road No.: | |
| LGA No.: | |
| Job No.: | |
| Road name: | |
| Suburb: | |
| Latitude: | |
| Longitude: | |
| Plan No.: | |
| Plan rev.: | |
| Rev. date: |
Inventory#
| Item | Value |
|---|---|
| Install/replace date: | Install |
| Replace | |
| Post height (m): | 1.2 |
| 3.2 | |
| 4.1 | |
| Mast arm outreach (m): | 2.5 |
| 5 | |
| 6.5 | |
| MA orientation to road (°): | |
| Foot diameter (mm): | |
| Combination mast arm outreach (m): | 2.5 |
| 5 | |
| 6.5 | |
| CMA outreach orientation to road (°): | |
| CMA RL mounting height (m): | 9.0 |
| 10.5 | |
| 12 | |
| CMA RL transition size (m): | 1.4 |
| 2.9 | |
| 4.4 | |
| CMA RL outreach size (m): | 1.5 |
| 3.0 | |
| 4.5 | |
| CMA RL outreach type: | Single |
| Double | |
| None | |
| Other | |
| Rate 3 Label: | Yes |
| No | |
| Rate 2 | |
| Foot diameter (mm): | |
| JUP RL mounting height (m): | 9.0 |
| 10.5 | |
| 12 | |
| JUP RL outreach size (m): | 1.0 |
| 1.5 | |
| 3 | |
| JUP RL outreach type: | Single |
| Double | |
| Rate 3 label: | Yes |
| No | |
| Rate 2 | |
| Foot diameter (mm): |
- Last audit/inspection outcomes not yet reviewed to determine remedial works
- No work required from last audit/inspection
- Decommissioned
- Design phase
- Tender phase
- Construction phase
- Remedial works certified and completed
Current status with respect to the last audit/inspection:
Additional comments:
Inspector name:
Inspector signature:
Inspection date:
Inventory on lanterns/pushbuttons/audio tactile#
| Field | Value |
|---|---|
| Region: | |
| Intersection/site number: | |
| Pole ID: | |
| Description: | |
| Road No.: | LGA No.: Job No.: |
| Road name: | Suburb: |
| Latitude: | Longitude: |
| Plan No.: | Plan rev.: Rev. date: |
Inventory#
| Item | Value |
|---|---|
| Install/replace date: | Install Replace |
| Lantern manufacturer: | Aldridge Pannich Other |
| Aspect type: | LED QH Incandescent |
| Aspect size (mm): | 200 300 |
| No. of round aspects: | 1 2 3 4 |
| No. of arrow aspects: | 1 2 3 4 |
| Visor: | Open Closed Cutaway left Cutaway right |
| Louvres: | Yes No Horizontal Vertical |
| Target boards: | Yes No |
| Push button manufacturer: | N/A Aldridge (ATS) ATS/AEI (pre July 2010) |
| AEI (pre July 2010) Pannich Safe Roads (BPC) Other | |
| Audio tactile installed: | Yes No |
- Last audit/inspection outcomes not yet reviewed to determine remedial works
- No work required from last audit/inspection
- Decommissioned
- Design phase
- Tender phase
- Construction phase
- Remedial works certified and completed
Current status with respect to the last audit/inspection:
Additional comments:
Inspector name:
Inspector signature:
Inspection date: