2Measurement of work#

2.1Standard Work Items#

In accordance with the provisions of Clause 2.1.3 of MRS01 Introduction to Specifications, the Standard Work Items covered by this Specification are listed in Table 2.1.

Table 2.1 – Standard Work Items
Standard Item NoDescriptionUnit of Measurement
Provision for Traffic
20002Travel Time Surveyslump sum
20003Construction and removal of side-trackm²
20004Supply of temporary barriersm
20005Installation of temporary barriersm
20006Supply of temporary barrier end treatmentseach
20007Installation of temporary barrier end treatmentseach
20008PSupply of anti-gawking screens (Provisional Quantity, if ordered)m
20012PInstallation of anti-gawking screens (Provisional Quantity, if ordered)m
20016Traffic management inspectionslump sum
20017Planning of temporary traffic management (TMP)lump sum
20018Design of temporary traffic management (TGS)lump sum
20019Implementation, maintenance and removal of temporary traffic managementlump sum
20020Administration of temporary traffic managementlump sum
Table in words
  • Standard Item No 20002 is Travel Time Surveys, measured in lump sum.
  • Standard Item No 20003 is Construction and removal of side-track, measured in m².
  • Standard Item No 20004 is Supply of temporary barriers, measured in m.
  • Standard Item No 20005 is Installation of temporary barriers, measured in m.
  • Standard Item No 20006 is Supply of temporary barrier end treatments, measured in each.
  • Standard Item No 20007 is Installation of temporary barrier end treatments, measured in each.
  • Standard Item No 20008P is Supply of anti-gawking screens (Provisional Quantity, if ordered), measured in m.
  • Standard Item No 20012P is Installation of anti-gawking screens (Provisional Quantity, if ordered), measured in m.
  • Standard Item No 20016 is Traffic management inspections, measured in lump sum.
  • Standard Item No 20017 is Planning of temporary traffic management (TMP), measured in lump sum.
  • Standard Item No 20018 is Design of temporary traffic management (TGS), measured in lump sum.
  • Standard Item No 20019 is Implementation, maintenance and removal of temporary traffic management, measured in lump sum.
  • Standard Item No 20020 is Administration of temporary traffic management, measured in lump sum.

2.2Work Operations#