2Measurement of work#
2.1Standard Work Items#
In accordance with the provisions of Clause 2.1.3 of MRS01 Introduction to Specifications, the Standard Work Items covered by this Specification are listed in Table 2.1.
Table 2.1 – Standard Work Items
| Standard Item No | Description | Unit of Measurement |
|---|---|---|
| Provision for Traffic | ||
| 20002 | Travel Time Surveys | lump sum |
| 20003 | Construction and removal of side-track | m² |
| 20004 | Supply of temporary barriers | m |
| 20005 | Installation of temporary barriers | m |
| 20006 | Supply of temporary barrier end treatments | each |
| 20007 | Installation of temporary barrier end treatments | each |
| 20008P | Supply of anti-gawking screens (Provisional Quantity, if ordered) | m |
| 20012P | Installation of anti-gawking screens (Provisional Quantity, if ordered) | m |
| 20016 | Traffic management inspections | lump sum |
| 20017 | Planning of temporary traffic management (TMP) | lump sum |
| 20018 | Design of temporary traffic management (TGS) | lump sum |
| 20019 | Implementation, maintenance and removal of temporary traffic management | lump sum |
| 20020 | Administration of temporary traffic management | lump sum |
Table in words
- Standard Item No 20002 is Travel Time Surveys, measured in lump sum.
- Standard Item No 20003 is Construction and removal of side-track, measured in m².
- Standard Item No 20004 is Supply of temporary barriers, measured in m.
- Standard Item No 20005 is Installation of temporary barriers, measured in m.
- Standard Item No 20006 is Supply of temporary barrier end treatments, measured in each.
- Standard Item No 20007 is Installation of temporary barrier end treatments, measured in each.
- Standard Item No 20008P is Supply of anti-gawking screens (Provisional Quantity, if ordered), measured in m.
- Standard Item No 20012P is Installation of anti-gawking screens (Provisional Quantity, if ordered), measured in m.
- Standard Item No 20016 is Traffic management inspections, measured in lump sum.
- Standard Item No 20017 is Planning of temporary traffic management (TMP), measured in lump sum.
- Standard Item No 20018 is Design of temporary traffic management (TGS), measured in lump sum.
- Standard Item No 20019 is Implementation, maintenance and removal of temporary traffic management, measured in lump sum.
- Standard Item No 20020 is Administration of temporary traffic management, measured in lump sum.