Item 20019Implementation, maintenance and removal of temporary traffic management#

Work Operations incorporated in the above items include:

  • a) Work Operations listed in Clause 2.1.5 of MRS01 Introduction to Specification
  • b) provision and placement of the prescribed traffic control devices for the warning, guidance and protection of the traffic and the protection of workers, construction plant and other property on or adjacent to the works
  • c) provision of Police control, as necessary
  • d) provision of Traffic Controllers, as necessary
  • e) construction, maintenance and removal of temporary access along or across the site for pedestrians, cyclists and agricultural machinery, as necessary
  • f) construction, maintenance and removal of temporary vulnerable road user (cyclists, pedestrians, and motorcyclists) infrastructure
  • g) relocation of any bus stops affected by changes in traffic arrangements
  • h) covering and uncovering new signs, as necessary
  • i) covering or removal of traffic control devices when not in use
  • j) maintenance of emergency vehicle access at all times
  • k) relocation of all existing signage and any modifications required thereto to ensure that the standard of signage is consistent with that existing prior to the Contractor commencing work and that it is consistent with the requirements of the Traffic Guidance Schemes
  • l) supply and installation of site access signs and all other traffic control signage as detailed in the traffic Guidance Schemes
  • m) supply and operation of traffic control devices
  • n) supply and installation of temporary delineation of trafficked corridors
  • o) supply, installation and operation of temporary traffic signals
  • p) supply and installation of temporary delineation where access to streets and side roads has been altered
  • q) provision for the detouring of traffic
  • r) dust control
  • s) maintenance of entrances and construction of alternative entrances (as necessary) to private properties
  • t) maintenance of trafficable surfaces, where specified
  • u) implementation and monitoring of the Traffic Management Plan when such is specified
  • v) supply of all materials, plant and equipment for temporary road lighting
  • w) installation and maintenance of temporary road lighting equipment and removal of temporary road lighting equipment after permanent road lighting is installed, or as directed by the Administrator.
  • x) provision of all other facilities for the safe passage of vehicular traffic through and around the works
  • y) removal of all temporary works and control devices used in the provisions for traffic
  • z) design and construction of side-tracks, where no separate item is provided for this work in the schedule
  • aa) inspections of temporary traffic management, including vulnerable road user (cyclists, pedestrians and motorcyclists) infrastructure and travelled paths (where required)
  • bb) drive throughs and walk throughs of temporary traffic management, including vulnerable road user (cyclists, pedestrians and motorcyclists) infrastructure, following implementation
  • cc) supply, installation, maintenance and removal of temporary barriers other than those nominated in Clause 1 of Annexure MRS02.1
  • dd) supply, installation, maintenance and removal of temporary barrier end treatments other than those nominated in Clause 2 of Annexure MRS02.1
  • ee) supply, installation, maintenance and removal of anti-gawking screens other than those nominated in Clause 3 of Annexure MRS02.1, and
  • ff) all other operations associated with the implementation, maintenance and removal of temporary traffic management as required by the Queensland MUTCD Part 3, QGTTM and any other contractual and legislative requirements.