Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›MRS02
MRS02

Contents

  • Copyright
  • Licence
  • CC BY licence summary statement
  • Translating and interpreting assistance
  • Disclaimer
  • Feedback
  • 1Introduction
  • 2Measurement of work
  • Item 20002Travel Time Surveys
  • Item 20003Construction and removal of side-track
  • Item 20004Supply of Temporary Barriers
  • Item 20005Installation of Temporary Barriers
  • Item 20006Supply of temporary barrier end treatments
  • Item 20007Installation of temporary barrier end treatments
  • Item 20008PSupply of anti-gawking screens (Provisional Quantity, if ordered)
  • Item 20012PInstallation of anti-gawking screens (Provisional Quantity, if ordered)
  • Item 20016Traffic management inspections
  • Item 20017Planning of temporary traffic management (TMP)
  • Item 20018Design of temporary traffic management (TGS)
  • Item 20019Implementation, maintenance and removal of temporary traffic management
  • 20020Administration of temporary traffic management

Item 20016Traffic management inspections#

Work Operations incorporated in the above items include:

  • a) traffic management inspections as per Clause 7.4 of MRTS02.
Source: MRS02 · page 6 Open PDF at this page Search this document
← PreviousItem 20012P Installation of anti-gawking screens (Provisional Quantity, if ordered) Next →Item 20017 Planning of temporary traffic management (TMP)
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.