Item 20007Installation of temporary barrier end treatments#

Work Operations incorporated in the above items include:

  • a) Work Operations listed in Clause 2.1.5 of MRS01 Introduction to Specifications
  • b) installation of end treatment
  • c) removal of end treatment for reuse or storage as necessary, and
  • d) maintenance of end treatment.