Item 20007Installation of temporary barrier end treatments#
Work Operations incorporated in the above items include:
- a) Work Operations listed in Clause 2.1.5 of MRS01 Introduction to Specifications
- b) installation of end treatment
- c) removal of end treatment for reuse or storage as necessary, and
- d) maintenance of end treatment.