6.Construction-specific requirements:#

  • developing emergency response procedures (e.g. evacuation, first response)
  • redirecting traffic away from the location of an incident
  • communicating and alerting people in an emergency.
  • preparing a work health and safety management plan
  • developing safe work method statements for high-risk construction work
  • designing traffic guidance schemes and implementing traffic control arrangements for works on or near roads
  • closure of roadways and footpaths.

Drawings from the original pages

Source: WHSQ On-site TM Project Phase 1 · page 3 Open PDF at this page Search this document