What was assessed?#

Inspectors used a three point assessment tool (2-Compliant; 1-Partially compliant; 0-Not compliant) to assess compliance levels.

The assessments consisted of a range of items split into six sections. These sections represent basic components of effective traffic management. The items within each section cover regulatory requirements as well as recognised industry practices. The sections are:

Drawings from the original pages

Source: WHSQ On-site TM Project Phase 1 · page 3 Open PDF at this page Search this document