Next steps#
The traffic management processes used by workplaces that were assessed in the first phase of this campaign were found to be generally good. The positive findings may be due to the types of workplaces that participated in the campaign. Firstly, inspectors sought participation from worksites for an assessment. This could mean workplaces that were assessed were more likely to be better performers. Secondly, inspectors contacted workplaces in advance of a site visit to encourage them to use the project self-assessment tool to prepare for the visit.
Inspectors identified a number of areas where further improvement is required, including:
- closer consultation, cooperation and coordination with workers, sub-contractors and supply chain partners
- using higher-level control measures to prevent people and plant/vehicles from interacting (e.g. eliminating traffic, isolating people from the hazard, engineering solutions)
- ensuring risk assessments are site-specific rather than generic documents
- simplifying traffic management plans by using pictures and diagrams.
WHSQ inspectors will commence the next phase of worksite assessments in early 2017. This means your workplace could be visited. To improve traffic management in your workplace it is recommended that you use the Onsite traffic management self-assessment tool. This tool will help you to review the effectiveness of your current control measures.
The following case studies show what good traffic management looks like:
- Dindas Australia
- Hyne Timber
- Roadtek
There are other resources, including guidance material, presentations and films available on the www.worksafe.qld.gov.au website.
