WHSQ On-site TM Project Phase 1

Contents

  • Onsite traffic management project
  • Background
  • Who was involved?
  • Which industries were assessed?
  • What size were workplaces?
  • Where were assessments done?
  • What types of plant and vehicles were used at workplaces?
  • What was assessed?
  • 1.Understanding the site’s traffic needs:
  • 2.Developing a traffic management plan (TMP):
  • 3.Controlling the risk of people being hit by plant or vehicles:
  • 4.Observing traffic and pedestrian behaviour:
  • 5.Preparing for an emergency:
  • 6.Construction-specific requirements:
  • What were the findings?
  • Next steps
  • Appendix 1

Which industries were assessed?#

Which industries were assessed?
IndustryNumber
Industrial (e.g. transport, manufacturing, logistics)193
Construction100
Agriculture29

Drawings from the original pages

Drawing on page 2 of WHSQ On-site TM Project Phase 1p. 2Drawing on page 2 of WHSQ On-site TM Project Phase 1p. 2Drawing on page 2 of WHSQ On-site TM Project Phase 1p. 2
Source: WHSQ On-site TM Project Phase 1 · page 2 Open PDF at this page Search this document
← PreviousWho was involved? Next →What size were workplaces?
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.