Skip to content
TTM WIKIby TekSwipe Traffic
  • Search
  • Ask AI
  • Quiz
  • Library
  • About
  • TekSwipe ↗
Sign in
Library›TRUM Vol 4 Part 2
TRUM Vol 4 Part 2

Contents

  • Copyright
  • Licence
  • CC BY licence summary statement
  • Translating and interpreting assistance
  • Feedback
  • 1Introduction
  • 2Scope
  • 3Abbreviations
  • 4Definition of terms
  • 5References
  • 6
  • General maintenance requirements
  • 7Scheduled inspections and maintenance
  • 8Unscheduled maintenance
  • Appendix ARate 3 road lighting asset and site information
  • Appendix BRate 3 road lighting maintenance reports
  • Appendix CTemporary road lighting repair sign
  • Appendix DBulk lamp replacement interval for HPS Lamps
  • Appendix EPeriodic verification of electrical installations

4Definition of terms#

The Act
Electrical Safety Act 2002, Regulations and Codes of Practice
Current
Current at the time of the maintenance activity
Electricity Entity
As defined in the Act
Electrical Works
As defined in the Act
Wiring Rules
AS/NZS 3000 commonly referred to as the Wiring Rules
Source: TRUM Vol 4 Part 2 · page 5 Open PDF at this page Search this document
← Previous3 Abbreviations Next →5 References
TEKSWIPE TRAFFICTraffic management design & software · Cairns, QLD

TTM Wiki is built by TekSwipe Traffic. Need a traffic guidance scheme? Order a plan from TekSwipe Traffic ↗

TTM Wiki

  • Search
  • Ask AI
  • Quizzes
  • Document library
  • About

TekSwipe Traffic

  • tekswipetraffic.com.au ↗
  • Chainage — QLD chainage finder ↗

Unofficial reference. Always confirm requirements against the current official publication. Source documents © State of Queensland, used under their published licences.