Appendix BRate 3 road lighting maintenance reports#

The following inspection reports are to be produced.

Rate 3 – Road lighting#

Inspection on electrical switchboards#

Region:
Switchboard ID:
Description:
Road No.:LGA No.:Job No.:
Road name:Suburb:
Latitude:Longitude:
Plan No.:Plan rev.:Rev. date:

Inventory#

ItemPassFailCorrective Action Required
IERASMRTS
Safe location❑❑❑❑
Safe access (present and future)❑❑❑❑
Pole guard❑❑❑❑
Seal against vermin❑❑❑❑
Protection against direct contact❑❑❑❑
Signs of degradation❑❑❑❑
Main switch labelled❑❑❑❑
Protection devices labelled❑❑❑❑
MEN link❑❑❑❑
Earth conductor / clamp / stake❑❑❑❑
Neutral link❑❑❑❑
Photocell (operation, orientation, fixture, etc.)❑❑❑❑
Drawing / conduit schedule correct❑❑❑❑
Submain connection correct❑❑❑❑
Exposed conductors❑❑❑❑
Unearthed equipment (including all metallic fixtures)❑❑❑❑
Suitable IP rating❑❑❑❑
Table in words
  • For the item Safe location, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Safe access (present and future), the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Pole guard, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Seal against vermin, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Protection against direct contact, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Signs of degradation, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Main switch labelled, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Protection devices labelled, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item MEN link, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Earth conductor / clamp / stake, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Neutral link, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Photocell (operation, orientation, fixture, etc.), the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Drawing / conduit schedule correct, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Submain connection correct, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Exposed conductors, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Unearthed equipment (including all metallic fixtures), the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Suitable IP rating, the Pass, Fail and Corrective Action Required columns are marked with ❑.

Rate 3 – Road lighting#

Inspection on electrical switchboards#

Tests#

ItemValuePassFailCorrective Action Required
IERASMRT S
Main earth conductor resistance (Ohm)❑❑❑❑
Insulation resistance (MOhm)❑❑❑❑
Earth Fault Loop Impedance (Ohm) (External EFLI into supply)❑❑❑❑
PolarityN/A❑❑❑❑
Maximum Demand (A)❑❑❑❑
Voltage (V)❑❑❑❑
Table in words
  • For the item Main earth conductor resistance (Ohm), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Insulation resistance (MOhm), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Earth Fault Loop Impedance (Ohm) (External EFLI into supply), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Polarity, the Value is N/A and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Maximum Demand (A), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Voltage (V), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.

Additional comments:

Inspector name:

Inspector signature:

Inspection date:

Rate 3 – Road lighting#

Inspection on circuits and cables#

Region:
Switchboard ID:
Description:
Circuit ID:
Description:
Road No.:LGA No.:Job No.:
Road name:Suburb:
Latitude:Longitude:
Plan No.:Plan rev.:Rev. date:

Inspections#

ItemPassFailCorrective Action Required
IERASMRTS
Correctly terminated❑❑❑❑
Correctly labelled❑❑❑❑
Correct colour coding❑❑❑❑
Signs of degradation❑❑❑❑
Cable protection type / size❑❑❑❑
Drawing correct❑❑❑❑
Correct circuit connections❑❑❑❑
Table in words
  • For the item Correctly terminated, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Correctly labelled, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Correct colour coding, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Signs of degradation, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Cable protection type / size, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Drawing correct, the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Correct circuit connections, the Pass, Fail and Corrective Action Required columns are marked with ❑.

Tests#

ItemValuePassFailCorrective Action Required
IERASMRTS
Insulation resistance (MOhm)❑❑❑❑
Earth fault loop impedance (Ohm)❑❑❑❑
Full load current❑❑❑❑
PolarityN/A❑❑❑❑
Table in words
  • For the item Insulation resistance (MOhm), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Earth fault loop impedance (Ohm), the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Full load current, the Value is blank and the Pass, Fail and Corrective Action Required columns are marked with ❑.
  • For the item Polarity, the Value is N/A and the Pass, Fail and Corrective Action Required columns are marked with ❑.

Rate 3 – Road lighting#

Inspection on circuits and cables#

Additional comments
Inspector name
Inspector signature
Inspection date

Rate 3 – Road lighting#

Inspection on poles#

FieldValue
Region:
Switchboard ID:
Description:
Circuit ID:
Description:
Pole ID:
Description:
Pole number (Energex/Ergon):
Road No.:LGA No.:Job No.:
Road name:Suburb:
Latitude:Longitude:
Plan No.:Plan rev.:Rev. date:

Inspections#

ItemValuePassFailCorrective Action Required
IERASMRTS
Distance from HV lines (m)❑❑❑❑
Distance from LV lines (m)❑❑❑❑
Distance from communication lines (m)❑❑❑❑
Proximity to power poles (m)❑❑❑❑
Proximity to trees (m)❑❑❑❑
Clearance from railway lines (m)❑❑❑❑
Clearance from driveway (m)❑❑❑❑
Clearance from drainage (m)❑❑❑❑
Correct pole typeN/A❑❑❑❑
Slip base orientationN/A❑❑❑❑
Bolt tension❑❑❑❑
Height of slip plane to surface level❑❑❑❑
Height of top of cage to finished level❑❑❑❑
GroutingN/A❑❑❑❑
Stop tread❑❑❑❑
Correct conduit installationN/A❑❑❑❑
Table in words
  • For the item Distance from HV lines (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Distance from LV lines (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Distance from communication lines (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Proximity to power poles (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Proximity to trees (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Clearance from railway lines (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Clearance from driveway (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Clearance from drainage (m), the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Correct pole type, the value is N/A, with Pass, Fail, and Corrective Action Required columns.
  • For the item Slip base orientation, the value is N/A, with Pass, Fail, and Corrective Action Required columns.
  • For the item Bolt tension, the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Height of slip plane to surface level, the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Height of top of cage to finished level, the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Grouting, the value is N/A, with Pass, Fail, and Corrective Action Required columns.
  • For the item Stop tread, the value is blank, with Pass, Fail, and Corrective Action Required columns.
  • For the item Correct conduit installation, the value is N/A, with Pass, Fail, and Corrective Action Required columns.

Rate 3 – Road lighting#

Inspection on poles#

Electrical inspections#

ItemPassFailCorrective Action Required
IERASMRTS
Door and screw orientation/condition❑❑❑❑
Terminal panel❑❑❑❑
Earth connection❑❑❑❑
MEN link❑❑❑❑
Continuous neutral (same lug)❑❑❑❑
Continuous earth❑❑❑❑
Correct connection of slip base pins❑❑❑❑
Correct connection of GPO❑❑❑❑
Fixed incoming wiring❑❑❑❑
Luminaire circuit protection❑❑❑❑
Cable size to luminaire (mm²)❑❑❑❑
Cable fixed to catenary❑❑❑❑
Drawing correct❑❑❑❑
Polarity❑❑❑❑
Table in words
  • For the item Door and screw orientation/condition, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Terminal panel, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Earth connection, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item MEN link, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Continuous neutral (same lug), the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Continuous earth, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Correct connection of slip base pins, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Correct connection of GPO, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Fixed incoming wiring, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Luminaire circuit protection, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Cable size to luminaire (mm²), the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Cable fixed to catenary, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Drawing correct, the Pass, Fail, and Corrective Action Required columns are marked.
  • For the item Polarity, the Pass, Fail, and Corrective Action Required columns are marked.

Tests#

ItemValuePassFailCorrective Action Required
IERASMRTS
Earth integrity❑❑❑❑
Table in words
  • For the item Earth integrity, the value is blank, with Pass, Fail, and Corrective Action Required columns.
Additional comments
Inspector name
Inspector signature
Inspection date

Rate 3 – Road lighting#

Inspection on luminaires#

FieldValue
Region:
Switchboard ID:
Description:
Circuit ID:
Description:
Pole ID:
Description:
Luminaire ID:
Description:
Pole number (Energex/Ergon):
Road No.:LGA No.:Job No.:
Road name:Suburb:
Latitude:Longitude:
Plan No.:Plan rev.:Rev. date:

Inspections#

ItemPassFailCorrective Action Required
IERASMRTS
Luminaire check❑❑❑❑
Table in words
  • For the item Luminaire check, the Pass, Fail, and Corrective Action Required columns are marked.
Additional comments
Inspector name
Inspector signature
Inspection date

Rate 3 – Road lighting#

Inspection on pits and conduits#

FieldValue
Region:
Switchboard ID:
Description:
Pit ID:
Description:
Pit connected to:❑ Switchboard ❑ Road lighting pole ❑ Other
Pole ID:
Description:
Pole number (Energex/Ergon):
Road No.:
LGA No.:
Job No.:
Road name:
Suburb:
Latitude:
Longitude:
Plan No.:
Plan rev.:
Rev. date:

Inspections#

ItemPassFailCorrective Action Required
Pit surround❑❑❑ ❑
Pit level with surrounding surface❑❑❑ ❑
Earth subsidence round pit❑❑❑ ❑
Pit wall deflection/damage❑❑❑ ❑
Pit lid intact❑❑❑ ❑
Pit marker❑❑❑ ❑
Pit in suitable location❑❑❑ ❑
Water in pit❑❑❑ ❑
Pit clean❑❑❑ ❑
Conduit depth (mm)❑❑❑ ❑
Conduit protruding > 100 mm❑❑❑ ❑
Conduit sealed❑❑❑ ❑
Drawing correct❑❑❑ ❑
Cable joint condition❑❑❑ ❑
Cable joint kit condition❑❑❑ ❑
Heatshrink condition❑❑❑ ❑
Ingress of moisture in cable joint (water in joint kit)❑❑❑ ❑
ItemPassFailCorrective Action Required
Correct active connection in joint kit❑❑❑ ❑
Correct neutral connection in joint kit❑❑❑ ❑
Correct MEN link❑❑❑ ❑
Correct cable size for earth, neutral and active to pole❑❑❑ ❑
Support for cable joint kit❑❑❑ ❑
Exposed conductors❑❑❑ ❑

Additional comments:#

Inspector name:#

Inspector signature:#

Inspection date:#