5.21Departures from standards and innovation#

Where designers propose variations to the mandatory requirements of the Queensland MUTCD Part 3 or the QGTTM, or where the use of innovative treatments are proposed to be adopted for use by traffic controllers, a documented risk assessment certified by a Registered Professional Engineer Queensland (RPEQ) may be required.

Source: TCAS Approved Procedure · page 39 Open PDF at this page Search this document