2Design Process#

2.5Essential Design Principles#

2.5.8Combining different works protection methods#

New

Combining different works protection methods at the one mobile works site is permitted where the requirements for the different works protection methods are met. Within a mobile works site, a static work site treatment (QGTTM Part 3) or short-term low-impact works protection methods (QGTTM Part 5) may be used when appropriate and when satisfying the risk assessment and other provisions and criteria of the different works protection methods. When a static work site treatment (QGTTM Part 3) or short-term low-impact works protection methods (QGTTM Part 5) are used in a mobile works site, the respective requirements of QGTTM Part 3 or Part 5 must be applied.

Added default speed limit values used in Queensland and adjusted terminology for default speed limits to match other TMR documents (built-up area and not in a built-up area).
Added a new Section on using a combination of different work protection methods within a mobile work site.
See changes highlighted yellow following.
Source: TTM Update · page 112 Open PDF at this page Search this document