13Install bracket#

INSTALL BRACKET – Install joint enclosure support bracket on the inside wall of the pit at a height to allow clearance from pit lid (recommended 400 mm from top of pit to top of bracket).
INSTALL JOINT – Once the bracket is installed, install the joint base on the bracket. This will provide a stable support for the installation of the sealant.
FINALISING – Ensure the cables and terminations are neatly together and the earth label is clearly visible.
