16Completion#
SUPPORT BRACKET – Fix dome in support bracket in pit.
INSTALL LID – Place the pit lid back onto the pit.
EARTH LABEL – Ensure the two-hole earth label is connected to the pole earth cable adjacent to the terminal.
SUPPORT BRACKET – Fix dome in support bracket in pit.
INSTALL LID – Place the pit lid back onto the pit.
EARTH LABEL – Ensure the two-hole earth label is connected to the pole earth cable adjacent to the terminal.