Relationship table (harmonised to AGTTM03-21 Edition 1.1)#

SectionDescriptionApplicability
1Introduction
1.1PurposeAccepted
1.2Structure of AGTTMAccepted
1.3Scope of Part 3Accepted
1.4Application of Part 3 to New ZealandAccepted
1.5DefinitionsAccepted
2Design Process
2.1GeneralAccepted
2.2Risk assessmentAccepted with amendments
2.2.1Risk considerationsAccepted
2.2.2Hierarchy of control – eliminate, separate or controlAccepted
2.3Design steps – around, through, pastAccepted
2.4Design balanceAccepted
2.5Essential design principlesAccepted
2.5.1Worksite layoutAccepted
2.5.2Worksite accessAccepted
2.5.3SignsAccepted with amendments
2.5.4Sight distanceAccepted with amendments
2.5.5Road categoriesAccepted
2.5.6Traffic volumeAccepted
2.5.7Traffic lanesAccepted with amendments
2.5.8Lane widthAccepted with amendments
2.5.9SpeedAccepted
2.6Variations to designAccepted with amendments
SectionDescriptionApplicability
2.7Combining different works protection methodsNew
3Around the worksite
3.1GeneralAccepted
3.2Worksite layoutAccepted
3.3Separate the work areaAccepted
3.4Road closuresAccepted with amendments
3.4.1Property accessAccepted
3.5Safe traffic speedAccepted
3.6Safety bufferAccepted with amendments
3.7Advance warning areaAccepted
3.8Design and traffic managementAccepted with amendments
3.8.1DetoursAccepted with amendments
3.8.2Detours via sidetracksAccepted
3.8.3ContraflowAccepted
3.9Termination areaAccepted with amendments
3.10Vulnerable road usersAccepted
3.10.1PedestriansAccepted with amendments
3.10.2CyclistsAccepted with amendments
3.10.3MotorcyclistsAccepted
3.11Public transportAccepted
4Through the worksite
4.1GeneralAccepted
4.2Worksite layoutAccepted
4.3Separate the work areaAccepted
4.4Delineate the routeAccepted
SectionDescriptionApplicability
4.5Safe traffic speedAccepted with amendments
4.6Safety bufferAccepted
4.7Traffic control and site entryAccepted with amendments
4.8Advance warning areaAccepted with amendments
4.8.1Intersections within the advance warning areaNew
4.8.2Police performing planned traffic control dutiesNew
4.8.3Additional end-of-queue protectionNew
4.8.4Queued traffic ahead multi-message signNew
4.9Termination areaAccepted with amendments
4.10Vulnerable road usersAccepted
4.10.1PedestriansAccepted with amendments
4.10.2CyclistsAccepted with amendments
4.10.3MotorcyclistsAccepted
4.11Public transportAccepted
5Past the worksite
5.1GeneralAccepted
5.2Worksite layoutAccepted
5.3Separate the work areaAccepted
5.3.1Road safety barrier systemAccepted with amendments
5.3.2Containment fenceAccepted with amendments
5.3.3Visibility screensAccepted with amendments
5.4Delineate the routeAccepted with amendments
5.4.1Traffic cones and bollardsAccepted with amendments
5.4.2Temporary hazard markersAccepted with amendments
5.4.3Temporary kerbingAccepted
5.4.4Shuttle flowAccepted with amendments
5.5Safe traffic speedAccepted with amendments
5.5.1Temporary speed limitsAccepted with amendments
5.5.2Temporary speed humpsAccepted with amendments
5.5.3Rumble stripsAccepted with amendments
5.5.4Speed enforcementNew
5.6Safety bufferAccepted with amendments
5.7Overhead clearanceAccepted
5.8Additional warning area and devicesAccepted
5.8.1Truck-mounted attenuatorsAccepted with amendments
5.9Transition areaAccepted
5.9.1TapersAccepted with amendments
5.9.2ChicanesAccepted with amendments
5.9.3ContraflowAccepted
5.9.4Closing the shoulderNew
5.10Traffic controlAccepted with amendments
5.10.1Portable traffic control devicesAccepted with amendments
5.10.2Traffic controllersAccepted with amendments
5.10.3Site entryAccepted
SectionDescriptionApplicability
5.10.4Combining portable traffic control devicesNew
5.11Advance warning areaAccepted with amendments
5.12Termination areaAccepted with amendments
5.13Vulnerable road usersAccepted
5.13.1PedestriansAccepted with amendments
5.13.2CyclistsAccepted with amendments
5.13.3MotorcyclistsAccepted
5.14Public transportAccepted
6Design for additional issues
6.1GeneralAccepted
6.2Permanent traffic signalsAccepted
6.3RoundaboutsAccepted
6.4Overtaking laneAccepted
6.5Shoulder as a temporary laneAccepted with amendments
6.6Pavement markingsAccepted with amendments
6.7Night worksAccepted with amendments
6.8ExcavationsAccepted with amendments
6.8.1Lateral excavationsNew
6.9Unattended worksitesAccepted
SectionDescriptionApplicability
6.10Placement and Operation of Portable Variable Message Sign (VMS)Accepted with amendments
6.10.1Principles and guidanceAccepted with amendments
6.10.2Aiming distanceAccepted with amendments
6.10.3Longitudinal placementAccepted
6.10.4Lateral placementAccepted with amendments
6.10.5VisibilityAccepted
6.10.6Other location requirementsNew
6.10.7Drive through requirementsNew
6.10.8TVMS specificationNew
6.10.9Display of messages on TVMSsNew
6.11Clear ZonesNew
6.11.1Factors influencing the clear zoneNew
6.11.2Determination of clear zone requirementsNew
6.12Star picketsNew
7How to apply the Traffic Guidance System
7.1GeneralAccepted
7.2Pre-installationAccepted
7.3InstallationAccepted with amendments
7.4RemovalAccepted with amendments
7.4.1Redundant devicesAccepted with amendments
7.4.2Ghost markingsAccepted
7.5Inspection and record keepingAccepted
SectionDescriptionApplicability
Appendices
ATemporarily closing or restricting access to roads
A.1GeneralNew
A.2Closing or restricting access on a state-controlled road onlyNew
A.3Closing a roadNew
A.4Restricting accessNew
A.5Warning of a road closure aheadNew
A.6Example layoutsNew