6.18.1Power surge protection devices#
- Determine if SPDs are required.
- Provide primary line-to-neutral protection at installation entry.
- Provide secondary line-to-neutral and neutral-to-earth protection at DB or equipment if required.
- Select surge rating in accordance with table for location.
- Ensure 10–20 m cable between primary and secondary protection.
- Provide 32 A or 63 A SPD fuse.
- Keep SPD cables short and straight.
- Design good earthing and bonding.
- Communications surge protection devices
- Determine if SPDs are required.
- Provide primary protection at installation entry close to MSB.
- Provide secondary protection at equipment if required.
- Refer communications equipment manufacturer for SPD recommendations.
- Connect communications SPD earth and power SPD earth to common earth point.
- Connect common earth point to electrical earth.
- Keep SPD cables short and straight.
- Design good earthing and bonding.